Newlincs EfW facility

Newlincs EfW facility
NewLincs EfW facility in 2008
Map
Official nameNewLincs EfW facility
CountryEngland
LocationLincolnshire, Yorkshire and the Humber
Coordinates53°36′23″N 0°08′38″W / 53.6063°N 0.1439°W / 53.6063; -0.1439
Commission date2004
OperatorNewLincs Developments Ltd
Thermal power station
Primary fuelWaste
External links
CommonsRelated media on Commons

grid reference TA229138

The Newlincs EfW facility is an energy from waste facility which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]

See also

[edit]

References

[edit]
  1. ^ "Your waste, our energy" (PDF). Archived from the original (PDF) on 28 September 2007., www.newlincs.com, Retrieved 22 February 2007
[edit]