Cairo Light Rail Transit
From Wikipedia the free encyclopedia
Cairo Light Rail Transit | |||
---|---|---|---|
Overview | |||
Native name | القطار الكهربائي الخفيف | ||
Owner | National Authority for Tunnels | ||
Locale | Greater Cairo Area | ||
Transit type | Commuter rail | ||
Number of lines | 1 | ||
Number of stations | 12 | ||
Operation | |||
Began operation | 3 July 2022 | ||
Operator(s) | RATP Dev | ||
Rolling stock | CRRC Sifang EMUs | ||
Number of vehicles | 22 | ||
Train length | 6 cars | ||
Technical | |||
System length | 70 km (43 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
|
The Cairo Light Rail Transit (Arabic: القطار الكهربائي الخفيف) or Cairo LRT is an electrified regional rail system linking the city of Cairo to Egypt's New Administrative Capital and the 10th of Ramadan City. An initial 70 km route consisting of 12 stations was inaugurated on 3 July 2022.[1]
Although it is dubbed a light rail, the system is not a light rail in the sense the term is commonly used among transportation professionals. Based on its technical characteristics, it is more comparable to a modern regional commuter rail system such as the French RER or the German S-Bahns.
Further phases of the project are currently being built by a partnership between Egypt's National Authority for Tunnels and a consortium of Chinese construction companies. The full system is projected to extend over 100 km with 19 stations.[1]
The Cairo LRT system is operated and maintained by RATP Dev and CAC (CREC and AVIC) under contract with the National Authority for Tunnels, i.e. the Egyptian Ministry for Transportation.
History
[edit]The Light Rail Transit project was devised by the Egyptian government to link the New Administrative Capital to the current capital of Cairo. Additionally, the system would provide transportation to other New Urban Communities to the east of Cairo, such as 10th of Ramadan City, Badr City, Obour or El Shorouk.[2] In August 2017, a $1.24-billion contract was signed between Egypt's National Authority for Tunnels and a consortium of China Railway Engineering Corporation and AVIC International to start construction of the project.[3]
On 3 July 2022, an inauguration ceremony took place with the attendance of Egyptian President Abdel Fattah el-Sisi and Chinese ambassador Liao Liqiang.[4]
Route
[edit]The system links Cairo with 10th of Ramadan City and with the New Administrative Capital. The main branch of the system serves the city of Cairo in Adly Mansour station, providing an interchange with Line 3 of the Cairo Metro. The line extends east serving the New Urban Communities of El Obour, Future City, El Shorouk, New Heliopolis and Badr City. At Badr Station, the tracks separate, with one branch turning north towards 10th of Ramadan City and another turning south towards the New Administrative Capital. The northern branch currently terminates in the Knowledge City Station, in the outskirts of 10th of Ramadan. The line will reach the center of the city via an extension of 16.5 km (10.3 mi) with three more stations.[5]
The New Administrative Capital branch turns south, serving the Capital International Airport before terminating at Arts and Culture City. This station will provide an interchange with the Cairo-New Administrative Capital Monorail line in the future. The branch will serve the Nativity Cathedral and the Octagon military complex with an extension over 20.4 km (12.7 mi) and four stations over all before terminating at the future New Administrative Capital high-speed rail station.[5] And there is another extension of 5.5 km (3.4 mi) and one station until the industrial zone under studying.[5]
Light Rail Transit Capital Train | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Stations
[edit]Station | Opened |
---|---|
Adly Mansour 3 | 3 July 2022 |
El-Obour | 3 July 2022 |
Future | 3 July 2022 |
El-Shorouk | 3 July 2022 |
New Heliopolis | 3 July 2022 |
Badr | 3 July 2022 |
Station | Opened |
---|---|
Industrial Park | 3 July 2022 |
Knowledge City | 3 July 2022 |
West of Ramadan | Under construction |
10th of Ramadan | Under construction |
Ramadan City Center | Under construction |
Station | Opened |
---|---|
El-Robaiky | 3 July 2022 |
Hadayek al-Assema | 3 July 2022 |
Capital Airport | 3 July 2022 |
Arts and Culture City | 3 July 2022 |
Nativity Cathedral | Under construction |
Octagon | Under construction |
International Sports City | Under construction |
Central Capital | Under construction |
Industrial Zone | Under study |
See also
[edit]References
[edit]- ^ a b "Egypt's president inaugurates trial run of China-made LRT". Xinhua. 4 July 2022. Retrieved 5 July 2022.
- ^ "Electric Train Adly Mansour - Administrative Capital". National Authority for Tunnels. Retrieved 5 July 2022.
- ^ Oirere, Shem (5 September 2017). "Chinese Firm Wins Egyptian Light-Rail Project Pact". Engineering News-Record. Retrieved 5 July 2022.
- ^ "Egypt: First electrified light rail transit system begins operations". AfricaNews. 4 July 2022. Retrieved 5 July 2022.
- ^ a b c "LRT Light Rail ( Phase 3 - Phase 4 – Phase 5 )". Retrieved 5 January 2024.