Erligou station
From Wikipedia the free encyclopedia
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Chegongzhuang West Road / Chegongzhuang Street and Sanlihe Road Haidian District / Xicheng District border, Beijing China | |||||||||||||||
Coordinates | 39°55′52″N 116°19′38″E / 39.931025°N 116.327294°E | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited (Line 6) Beijing MTR Metro Line 16 Corp. Ltd. (Line 16) | |||||||||||||||
Line(s) | Line 6 Line 16 | |||||||||||||||
Platforms | 4 (4 side platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | March 18, 2023[1] | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Erligou station (simplified Chinese: 二里沟站; traditional Chinese: 二里溝站; pinyin: Èrlǐgōu Zhàn) is a station on Line 6 and Line 16 of the Beijing Subway.[2] The station opened on 18 March 2023.[1]
History
[edit]Erligou station did not enter into operation along with Line 6 Phase I on December 30, 2012. Both Line 6 and Line 16 platforms opened on March 18, 2023.[1] The platform for Line 16 is above the Line 6 platform.[3]
Location
[edit]The station is located at the intersection of the north-south Sanlihe Road with the east-west thoroughfare known as Chegongzhuang West Road (车公庄西路) to the west of Sanlihe Road and Chegongzhuang Street (车公庄大街) to the east.[4]
Station layout
[edit]Both the line 6 and line 16 stations have underground side platforms. There are 5 exits, lettered A1, A2, B, C and D. Exits A1 and A2 are accessible via elevators.
Gallery
[edit]- Line 6 westbound platform
- Line 16 northbound platform
- Line 6 platform overpass
- Line 6 North interchange concourse
- Line 6 South interchange concourse
- Line 6 South interchange concourse (2)
- Exit A plug-in concourse, notice the bifurcation point between the Exit A1 and A2 plug-in halls shows that the two plug-in halls are not completely flatlined
- Exit A1 plug-in concourse
- Exit A2 plug-in concourse
- Exit B plug-in concourse
- Exit C plug-in concourse
- Exit D plug-in concourse
- Lift 2 at Line 16 northbound platform
Line 6 reserved platforms during construction
[edit]- Reserved platform structure in the westbound tunnel of Line 6 (September 2021)
- Reserved platform structure of Line 6 where site lighting strips have been installed (December 2021)
- The installation of screen doors has started at the reserved platform structure in the eastbound tunnel of Line 6, and the previously installed site lighting strips are still visible (June 2022)
- Reserved platform structure in the Line 6 eastbound tunnel, screen doors installed (September 2022)
References
[edit]- ^ a b c "明天首班车起地铁二里沟站开通,6号线与16号线可双向换乘". 2023-03-17.
- ^ 地铁6号线一期沿线站名确定. Beijing Daily. 2010-11-12. Archived from the original on 2013-12-24. Retrieved 2013-03-19.
- ^ 北京地铁16号线车站设计方案展示 (in Simplified Chinese). 2013-04-25. Archived from the original on 2013-10-07. Retrieved 2014-12-30.
- ^ 6号线16号线增二里沟换乘站. 163.com news. 2012-02-09. Archived from the original on 2018-07-27. Retrieved 2012-02-24.