Japan National Route 289
National Route 289 | ||||
---|---|---|---|---|
国道289号 | ||||
Route information | ||||
Length | 275.4 km[1] (171.1 mi) | |||
Existed | 1999–present | |||
Major junctions | ||||
West end | Yoshida, Niigata | |||
Central section incomplete | ||||
East end | Iwaki, Fukushima | |||
Location | ||||
Country | Japan | |||
Highway system | ||||
|
National Route 289 is an incomplete national highway in Japan that will eventually connect central Niigata with Iwaki, Fukushima with a total length of 275.4 km (171.1 mi).
At present, work is underway to complete an 18 km (11 mi) central section that will join the eastern and western portions together through the very northern part of the Japanese Alps on Niigata's and Fukushima's prefectural border.
When finished, traffic will be able to travel coast to coast across Japan in a link between the Sea of Japan and Pacific.
Sections
[edit]Niigata
[edit]The western part of Route 289 begins in Yoshida passing east through the towns of Tsubame and Sanjo. It currently ends in the mountains 10 km south east of Shitada village.
Fukushima
[edit]The eastern part of Route 289 starts in Iwaki, Fukushima near Nakoso Station. It then heads west through Shirakawa and passed Shinshirakawa. It currently ends 12 km north west of Nishigō village.
Central part
[edit]Work to join the east and west sections began in 1999. But the scheme suffered a major setback after the Chūetsu earthquake in 2004 when landslips covered large parts of the route. In 2005/06 efforts were made to clear these blockages and restart building work.
The finished route, which presently is a dirt track and is only passable by 4x4s or construction traffic, will include several spanned bridges, avalanche covers and a 1.5 km tunnel.
A provisional completion date was given as 2012 but that has since lapsed.
References
[edit]- ^ "一般国道の路線別、都道府県別道路現況" [Road statistics by General National Highway route and prefecture] (PDF) (in Japanese). Ministry of Land, Infrastructure, Transport and Tourism. Retrieved 18 February 2020.
External links
[edit]- Tunnel Completion (In Japanese)
37°24′23.36″N 139°14′8.05″E / 37.4064889°N 139.2355694°E