Bankstown railway line
Bankstown railway line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Partially open | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Transport Asset Holding Entity | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 3 open | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | T6 Lidcombe & Bankstown | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Sydney Trains | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened to Belmore | 1 February 1895 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Extended to Bankstown | 14 April 1909 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connected to Sefton Park Junction | 16 July 1928 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | 30 September 2024 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 1,500 V DC overhead line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Bankstown railway line is a suburban railway which traverses the Inner West and Canterbury-Bankstown areas of Sydney. West of Bankstown it is used by T6 Lidcombe & Bankstown services, while east of Bankstown it is temporarily closed to facilitate conversion for its future use by M1 North West & Bankstown services.[1]
Route
[edit]As originally built, the line branched from the Illawarra railway line just south of Sydenham at Meeks Road Junction, approximately 6 kilometres southwest of Central. From here the line runs westward along the valley of the Cooks River, parallel to the Metropolitan Goods railway line. At Dulwich Hill the line passes by the former Wardell Road Junction, where the Dulwich Hill light rail line now terminates with an overbridge interchange to the railway station.[2]
Just past Canterbury, the line crosses to the southern side of the Cooks River. From here the line passes through Campsie, after which the Metropolitan Goods railway line turns away from the alignment towards Enfield Yard. Between Punchbowl and Bankstown is the former location of the Punchbowl Maintenance Depot, which has since been redeveloped for housing.[3]
Bankstown is the foremost station on the line. Originally a through station, it is being rebuilt into two abutting terminal stations, with Sydney Metro services to operate eastward from it and Sydney Trains services to operate westward.
Just west of Bankstown the line turns sharply northward, passing through Yagoona and Birrong to reach the western endpoint of the line at Sefton Park Junction. Here, the line connects to the Main Southern railway line between Regents Park and Sefton.
Services
[edit]The line has been used primarily for suburban passenger services since its opening. Though some freight services used the line earlier in its history,[4] cargo traffic is now confined to the dedicated freight tracks of the parallel Metropolitan Goods railway line between Marrickville and Campsie.
Historic services
[edit]Following the completion of the connection to Sefton Park Junction in 1928, suburban passenger services historically operated as a loop, with services originating from the City Circle travelling via Sydenham along the length of the line before returning to the City Circle via Lidcombe and the Main Suburban railway line, and vice versa.
This ceased in 2013 following completion of new turnbacks at Lidcombe and Homebush as part of the Rail Clearways Program. Between 2013 and 2024, services from the City Circle via the Bankstown railway line instead terminated either at the new turnback at Lidcombe, or continued westward along the Main Southern railway line to terminate at Liverpool instead.
Current and future services
[edit]In October 2024, Sydney Trains replaced their previous services along the length of the line with more limited T6 Lidcombe & Bankstown services west of Bankstown only.[5] East of Bankstown, the line is closed for works to convert it to Sydney Metro standards, after which that part of the line will be utilised by M1 North West & Bankstown services.[6]
History
[edit]Branch to Belmore
[edit]The line opened on 1 February 1895, initially as a branch from the Illawarra railway line at Sydenham to Belmore.[7] Railway authorities initially conceived of the line as a opportunity to alleviate pressure on the Old Main South railway line by providing an alternate route to Liverpool, and also to advance development of the intervening land. However, the 1890s depression constrained the development of the line.[8]
Extension to Bankstown and the Main Southern railway line
[edit]Increased suburban development prompted the line to be extended to Bankstown on 14 April 1909, with intermediate stations at Lakemba and Punchbowl. In 1916, the Metropolitan Goods railway line was constructed, running parallel to the line between Marrickville to Campsie. On 16 July 1928, the line was extended from Bankstown to Sefton Park Junction, where it joined the Main Southern railway line between Regents Park and Sefton.[4] This allowed trains to operate to Liverpool, or in a loop back toward the City Circle via Lidcombe and the Main Suburban railway line.[9]
Electrification
[edit]In 1926, the line between Sydenham and Bankstown became the second in Sydney to be electrified. To service the new electric rolling stock, Punchbowl Maintenance Depot was built on the line just east of Bankstown. Electrification was extended from Bankstown to Regents Park in 1939.[10] A new station between Lakemba and Punchbowl at Wiley Park opened on 19 June 1938. Punchbowl Maintenance Depot closed in 1994.[3]
Upgrades
[edit]In January 2006, a four-year project to upgrade the line was completed. The work included the re-sleepering of the entire line, replacing the former wooden sleepers with the more durable concrete ones, replacement and upgrade of the signalling, and also replacement of the ageing catenary, mostly with the more modern double contact wire variety. The lengthy upgrade process was noted for its "January Closedowns", in which the entire line was closed in January for the bulk of the upgrade work to take place.[11]
Conversion for Sydney Metro services
[edit]As part of the Sydney Metro City & Southwest project, the line from Sydenham to Bankstown is being converted from its current double deck commuter rail configuration to a rapid transit line.[12] This will allow much a higher frequency service and will alleviate bottlenecks in the Sydney Trains system, but ensuring the line meets modern metro standards is a technically challenging undertaking, particularly with some of the stations which have curved platforms over a century old.[13]
Planning approval of the upgrade of the line between Sydenham and Bankstown was received in December 2018.[14] Intermittent temporary closures began in December 2019 for works to prepare for the conversion to metro standards, with the expectation of a longer, extended closure to occur immediately prior to the commencement of metro services.[15][16]
In 2023, with conversion of the line having fallen a year behind schedule,[17] the NSW Government announced that the opening of Sydney Metro City & Southwest would be staged, with services metro services not reaching Bankstown until late 2025, after a 12-month closure of the line for conversion works.[6] Since 30 September 2024 the line east of Bankstown has been temporarily closed, with buses replacing rail services between Sydenham and Bankstown.[5]
References
[edit]- ^ NSW, Transport for (29 August 2024). "Free bus travel as T3 undergoes major Metro upgrade works | NSW Government".
- ^ Transport for NSW (9 October 2023). "New footbridge opens at Dulwich Hill Station". www.mysydney.nsw.gov.au. NSW Government. Retrieved 26 May 2024.
- ^ a b "Punchbowl Closure Forces Timetable Changes" Railway Digest February 1995 page 8
- ^ a b The Bankstown Line - an early history CityRail
- ^ a b Transport for NSW. "Southwest Link". transportnsw.info. NSW Government. Retrieved 25 May 2024.
- ^ a b "Minns Labor Government will deliver Sydenham to Bankstown section of City and Southwest Metro" (Press release). Sydney: NSW Government. 1 August 2023. Archived from the original on 4 August 2023. Retrieved 15 November 2023.
- ^ "NSW Railway Passenger Services 1880-1905" Australian Railway History" April 2005
- ^ Marrickville Railway Station Group Archived 26 January 2016 at the Wayback Machine NSW Office of Environment & Heritage
- ^ Bankstown Line Archived 8 September 2017 at the Wayback Machine NSWrail.net
- ^ "Sydney Electric Trains From 1926 to 1960" Australian Railway Historical Society Bulletin issue 762 April 2001
- ^ Bankstown Line upgrade successfully completed CityRail 6 February 2006
- ^ Sydney Metro. "Bankstown Line metro conversion approved" (PDF). NSW Government. Archived (PDF) from the original on 23 September 2023. Retrieved 3 November 2023.
- ^ Builders of Sydney's new metro line need to straighten out curved platforms Archived 9 February 2016 at the Wayback Machine Sydney Morning Herald 4 December 2015
- ^ "Sydney Metro Bankstown Line Metro Upgrade gets green light". Transport for NSW. 19 December 2018. Archived from the original on 18 June 2019. Retrieved 13 January 2020.
- ^ "Rail line closure to force 100,000 commuters a day to catch buses". Sydney Morning Herald. 18 July 2019. Archived from the original on 19 July 2019. Retrieved 19 July 2019.
- ^ Sydenham to Bankstown Preferred Infrastructure Report Overview Archived 22 August 2019 at the Wayback Machine Sydney Metro June 2018
- ^ O'Sullivan, Matt (10 April 2023). "'Nightmare': Residents enter fourth year of Metro pain as construction drags on". The Sydney Morning Herald. Archived from the original on 6 May 2023. Retrieved 6 May 2023.