Status | Operational |
Construction began | 2011 |
Commission date |
|
Construction cost | €3.8 billion SEK |
Owners | Skellefteå Kraft Fortum |
Power generation | |
Units operational | 99 |
Nameplate capacity |
|
Annual net output |
|
The Blaiken wind farm is a wind farm built by BlaikenVind AB, a joint venture of Skellefteå Kraft and Fortum. It is one of Europe's largest wind farms in northern Sweden. The park consists of 99 wind power plants and has a total capacity of 247.5 MW.[1] The farm has also been chosen as a demonstration plant by the EU's NER300 programme, one of the world's largest funding programmes for climate-neutral energy, and meets the challenge of developing good solutions for efficient wind power production in a cold and icy climate.[2][3]
References
[edit]- ^ "Blaiken wind farm". Skellefteå Kraft (in Swedish). Retrieved 2022-10-14.
- ^ Backwell, Ben (2010-08-31). "Fortum takes 40% stake in giant Swedish wind project". ReCharge. NHST Media Group. Retrieved 2010-08-31.
- ^ "Fortum to partner in one of Europe's biggest onshore wind farm projects with 40% holding" (Press release). Fortum. 2010-08-31. Retrieved 2010-08-31.[permanent dead link]
External links
[edit]