Sentinel-class cutter

Sentinel-class cutter
The USCGC Benjamin Bottoms in San Francisco
Class overview
NameSentinel class
OperatorsUnited States Coast Guard
Planned67 (possibly up to 71)
Completed57
Active55
Retired1
General characteristics
TypeCutter
Displacement353 long tons (359 t)
Length46.8 m (154 ft)
Beam8.11 m (26.6 ft)
Depth2.9 m (9.5 ft)
Propulsion
Speed28+ knots
Endurance
  • 5 days, 2,500 nautical miles (4,600 km; 2,900 mi)
  • Designed to be on patrol 2,500 hours per year
Boats & landing
craft carried
1 × Cutter Boat – Over the Horizon – Jet-drive
Complement4 officers, 20 crew
Sensors and
processing systems
  • L-3 C4ISR suite
  • AN/SPS-78 surface search and navigation radar
  • AN/SPS-50 surface search radar
  • RADA RPS-42 MHR air search radar
  • AN/APX-123(V)1 IFF (ship automation provided by MTU Callosum)
Armament1 × Mk 38 Mod 2 25 mm Machine Gun System (and 4 × crew-served Browning M2 machine guns on some cutters)

The Sentinel-class cutter, also known as the Fast Response Cutter or FRC due to its program name, is part of the United States Coast Guard's Deepwater program.[2][3][4] At 154 feet (46.8 m), it is similar to, but larger than, the 123-foot (37 m) lengthened 1980s-era Island-class patrol boats that it replaces. Up to 71 vessels are to be built by the Louisiana-based firm Bollinger Shipyards, using a design from the Netherlands-based Damen Group, with the Sentinel design based on the company's Damen Stan 4708 patrol vessel. The Department of Homeland Security's budget proposal to Congress, for the Coast Guard, for 2021, stated that, in addition to 58 vessels to serve the Continental US, they requested an additional six vessels for its portion of Patrol Forces Southwest Asia.[5]

Planning and acquisition

[edit]

In March 2007, newly appointed United States Coast Guard Commandant Thad Allen announced that the USCG had withdrawn a contract from Lockheed Martin and Northrop Grumman for the construction of an initial flawed design of what would eventually become the Sentinel class.[6][7][8][9] Allen announced that instead of the initial high-tech design Bollinger would build vessels based on an existing design, and the new program would focus more on existing "off-the-shelf" technology.

The design chosen was largely based on the Damen Stan 4708 patrol vessels from the Netherlands firm the Damen Group. The South African government operates three similar 154 ft Lillian Ngoyi-class vessels for environmental and fishery patrol.[10]

In September 2008, Bollinger Shipyards in Lockport, Louisiana, was awarded US$88 million to build the prototype first vessel in its class.[11] That prototype was the first of a projected series of 46.8-meter (154 ft) cutters. In September 2008 the series was expected to comprise a maximum of 24 to 34 cutters[12] but by the time the prototype cutter, which became USCGC Bernard C. Webber, entered service in 2012 the planned number of Sentinel-class cutters had grown to 58. They replaced the 37 remaining aging, 1980s-era 110 ft Island-class patrol boats.[13]

USCGC Bernard C. Webber and all following Sentinel-class vessels are named after enlisted Coast Guard heroes.[14] Bernard C. Webber was launched in April 2011, and commissioned in April 2012 at the Port of Miami. She and five sister ships are stationed in Miami, Florida. The second cohort of six vessels is homeported in Key West, Florida. The third cohort of six vessels is homeported in San Juan, Puerto Rico.[15]

A second contract was awarded on December 15, 2009 for an additional three Sentinel-class cutters at a cost of US$141 million. By April 2010 the Coast Guard's contract with Bollinger allowed for the order of up to 34 Sentinel-class cutters at a cost of up to US$1.5 billion. Even then, the Coast Guard was planning to build a total of 58 Sentinel-class cutters. [16]

In September 2013, Marine Link reported that the Coast Guard had placed orders with Bollinger Shipyards for additional cutters, bringing the number of such cutters ordered by then to thirty.[17]

In July 2014, it was announced that the U.S. Coast Guard had exercised a $225 million option at Bollinger Shipyards for construction through 2017 of an additional six Sentinel-class Fast Response Cutters (FRCs), bringing the total number of FRCs under contract with Bollinger to 30. Later that number was increased to 32 cutters.

In May 2016, Bollinger Shipyards announced that the U.S. Coast Guard had awarded it a new contract for building the final 26 Sentinel-class fast-response cutters. That brought to 58 the total number of FRCs that the USCG ordered from Bollinger.[18] Acquiring the 58 cutters was expected to cost the federal government $3.8 billion — an average of about $65 million per cutter.

By June 2016, 38 of the projected 58 FRCs had been ordered and 17 were in service. The Miami and Key West chorts were complete. The 18th fast response cutter, Joseph Tezanos, was delivered to the Coast Guard in Key West, Florida, in June 2016 en route to completing the San Juan cohort.[19]

On August 9, 2018 the Coast Guard exercised its contract option to order six more Sentinel-class cutters. These would be the 45th through 50th cutters of that class. With this order, the total value of orders under the contract grew to almost US$929 million. On August 21 the 30th fast response cutter, Robert Ward, was delivered.[20]

On July 31, 2019 the Coast Guard exercised its contract option to order another six Sentinel-class cutters. These would be the 51st through 56th cutters of that class. With this order, the total value of orders under the contract grew to about US$1.23 billion. Under the contract, the Coast Guard could order as many as 58 cutters, at a total cost of US$1.42 billion. The six new cutters were expected to be delivered starting in late 2022 and ending in late 2023.[21]

In September 2020, the Coast Guard announced it was ordering four more FRCs from Bollinger, to be delivered in 2024. These would be the 56th through 60th cutters of that class. At that time, 40 FRCs had been delivered and 38 had been commissioned. The Coast Guard had recently modified its contract with Bollinger to increase the maximum number of cutters that could be ordered under the contract to 64. The modified contract had a potential value of US$1.74 billion.[22]

In 2017, the Coast Guard announced two FRCs would be stationed in Astoria, Oregon starting in 2021.[23] In 2018, the Coast Guard announced four more would be stationed in San Pedro, California in 2018 and 2019.[24] Also in 2018, the Coast Guard revealed plans to eventually homeport a total of six FRCs in Alaska, with one cutter in Sitka, one in Seward, and two in Kodiak, joining two already operating from Ketchikan.[25] Boston, Massachusetts and St. Petersburg, Florida would eventually be FRC homeports.[26][27]

In June 2019, the United States House Committee on Armed Services approved a requirement for the US Navy to study the possibility of buying a version of the FRC, and basing them in Bahrain, where the USCG currently plans to base four FRCs.[28]

In 2019 Lieutenant Commander Collin Fox (USN), and columnist David Axe suggested that, when the US Navy started to develop unmanned patrol ships to replace the Cyclone class, which are similar in size to the Sentinel class, the hulls and other elements of the robot ships would be based on the Sentinels, and built in the same factory.[29][30]

In August 2021, the Coast Guard exercised its option to order four more Sentinel-class cutters—the 61st through 64th—from Bollinger. Bollinger planned to build the ships at Bollinger's Lockport, Louisiana facility[31] and deliver the first of the four vessels in the fall of 2024 and the last in the summer of 2025.[32]

In 2022, the Coast Guard awarded a $30 million contract to install a fixed pier and two floating docks to accommodate FRCs at East Tongue Point in Oregon. The first new cutter is expected to arrive at Astoria, Oregon in March 2024 rather than in 2021 as originally planned.[33]

In March 2022, President Joe Biden signed the Consolidated Appropriations Act for Fiscal Year 2022, which provided $130 million in funding for two additional FRCs, bringing the total number to 66.[34][35] In August 2022, the Coast Guard exercised its contract option for the first of these additional cutters, to be delivered by Bollinger in 2025.[36] This order expanded the total value of the Phase 2 contract with Bollinger Shipyards to US$1.8 billion.[37]

On May 8, 2024 the Coast Guard exercised a contract option for two additional FRCs, bringing the total vessels built by or under contract with Bollinger to 67[38] and the total value of the Phase 2 contract to about US$2 billion. The two new FRCs are expected to be delivered in fiscal year 2028.[39]

Mission

[edit]

The vessels perform various Coast Guard missions which include but are not limited to PWCS (Ports, Waterways, and Coastal Security), Defense Operations, Maritime Law Enforcement (Drug/migrant interdiction and other Law Enforcement), Search and Rescue, Marine Safety, and environment protection.[40]

Design and construction

[edit]
A graphic of USCG Sentinel-class cutter modifications made to the Damen Stan 4708 patrol vessel design
USCGC Raymond Evans, the tenth Sentinel-class cutter

The vessels are armed with a remote-control Mark 38 25 mm Machine Gun System and four crew-served .50-caliber (12.7 mm) M2HB heavy machine guns. They have a bow thruster for maneuvering in crowded anchorages and channels. They have small underwater fins, for coping with the rolling and pitching caused by large waves. They are equipped with a stern launching ramp, like the Marine Protector-class and the eight failed expanded Island-class cutters. They are manned by a crew of 22. The Fast Response Cutter deploys the 26-foot (7.9 m) Cutter Boat - Over the Horizon (OTH-IV) for rescues and interceptions.[41]

Modifications to the Coast Guard vessels from the Stan 4708 design include an increase in speed from 23 to 28 knots (43 to 52 km/h; 26 to 32 mph), fixed-pitch rather than variable-pitch propellers, stern launch capability, and watertight bulkheads.[42] The vessels are built to ABS High Speed Naval Craft rules and some parts of the FRC also comply to ABS Naval Vessel Rules.[43] The vessels meet Naval Sea Systems Command standards for two compartment damaged stability and meet the Intact and Damage Stability and reserve buoyancy requirements in accordance with the “Procedures Manual for Stability Analyses of U.S. Navy Small Craft".[44][45]

The vessels have space, weight, and power reserved for future requirements which includes weapons and their systems. The cutters have a reduced radar cross-section through shaping.[46] The bridge is equipped with a handheld device that allows crew members to remotely control the ship's functions, including rudder movement and docking.[47]

In February 2013, the Department of Homeland Security requested tenders from third party firms to independently inspect the cutters, during their construction, and their performance trials.[48]

At the September 2022 commissioning of USCGC Douglas Denman, it was announced that she had several upgrades compared to the two cutters deployed to Ketchikan, Alaska six years previously. These include an improved bow thruster and radar system and the addition of a forward-looking infrared camera.[49] Though initially stationed at Ketchikan, Douglas Denman will eventually be homeported at Sitka when port infrastructure improvements have been completed there.[50]

In March 2024, a Congressional Research Service report revealed that the Coast Guard's long term procurement plan called for the purchase of up to 71 FRCs. Six of the new cutters would be deployed to the Indo-Pacific region for engagement with allies and partner countries.[51]

Crew accommodation

[edit]

Prior to the deployment of the Marine Protector class, the Coast Guard decided that all its cutters, even its smallest, should be able to accommodate mixed-gender crews. The Sentinel-class cutters are able to accommodate mixed-gender crews. When USCGC Rollin Fritch was commissioned, a profile in The Philadelphia Inquirer asserted off-duty crew members had access to satellite television broadcasts.[47] The vessels come equipped with a desalination unit.[47]

Ships

[edit]
Name Hull
number
Delivered Commissioned Home
port
Status
Bernard C. Webber WPC-1101 April 21, 2011 April 14, 2012 Miami, Florida Active service[52]
Richard Etheridge WPC-1102 August 18, 2011 August 3, 2012[53] Miami, Florida Active service[52]
William Flores WPC-1103 2011-11-10 2012-11-03[54] Miami, Florida Active service[52]
Robert Yered WPC-1104 2012-11-17[55] 2013-02-15 Miami, Florida Active service[52]
Margaret Norvell WPC-1105 2013-01-13[56] 2013-06-01[57] Miami, Florida Active service[52]
Paul Clark WPC-1106 2013-05-18[58] 2013-08-24 Miami, Florida Active service[52]
Charles David Jr. WPC-1107 2013-08-17[59][60] 2013-11-16[61] Key West, Florida Active service[52]
Charles Sexton WPC-1108 2013-12-10[62] 2014-03-08[63] Key West, Florida Active service[52]
Kathleen Moore WPC-1109 2014-03-28[64] 2014-05-10 Key West, Florida Active service[52]
Raymond Evans[Note 1] WPC-1110 2014-06-25[65] 2014-09-06[66] Key West, Florida Active service[52]
William Trump WPC-1111 2014-11-25[67][68][69][70] 2015-01-24 Key West, Florida Active service[52]
Isaac Mayo WPC-1112 2015-01-13[71] 2015-03-28[72] Key West, Florida Active service[52]
Richard Dixon WPC-1113 2015-04-14[73] 2015-06-20 San Juan, Puerto Rico Active service[15][52]
Heriberto Hernandez WPC-1114 2015-07-30[74] 2015-10-16 San Juan, Puerto Rico Active service[15][75][52]
Joseph Napier WPC-1115 2015-10-20[76] 2016-01-29 San Juan, Puerto Rico Active service[15][52]
Winslow Griesser WPC-1116 2015-12-23 2016-03-11 San Juan, Puerto Rico Active service[15][52]
Donald Horsley WPC-1117 2016-03-05[77] 2016-05-20 San Juan, Puerto Rico Active service[52]
Joseph Tezanos WPC-1118 2016-06-22 2016-08-26[78] San Juan, Puerto Rico Active service[52]
Rollin Fritch WPC-1119 2016-08-23 2016-11-19 Cape May, New Jersey Active service[52]
Lawrence Lawson WPC-1120 2016-10-20 2017-03-18[79] Cape May, New Jersey Active Service[52]
John McCormick WPC-1121 2016-12-13[80] 2017-04-12[81] Ketchikan, Alaska Active service[52]
Bailey Barco WPC-1122 2017-02-07[82][83] 2017-06-14[84] Ketchikan, Alaska Active service[52]
Benjamin Dailey WPC-1123 2017-04-20[85][86][87] 2017-07-04[88] Decommissioned[89] after being heavily damaged by fire on December 10, 2021.[90]
Oliver Berry WPC-1124 2017-06-27[91] 2017-10-31[92] Honolulu, Hawaii Active service[52]
Jacob Poroo WPC-1125 2017-09-05[93] 2017-12-08[94] Pascagoula, Mississippi Active service[52]
Joseph Gerczak WPC-1126 2017-11-09[95] 2018-03-09[96] Honolulu, Hawaii Active service[52]
Richard Snyder WPC-1127 2018-02-08[97] 2018-04-20[98] Atlantic Beach, North Carolina Active service[52]
Nathan Bruckenthal WPC-1128 2018-03-29[99] 2018-07-25[100] Atlantic Beach, North Carolina Active service[52]
Forrest Rednour WPC-1129 2018-06-07[101] 2018-11-08[102] San Pedro, California Active service[52]
Robert Ward WPC-1130 2018-08-21[103] 2019-03-02[104] San Pedro, California Active service[52]
Terrell Horne WPC-1131 2018-10-25[105] 2019-03-22[106] San Pedro, California Active service[52]
Benjamin Bottoms WPC-1132 2019-01-08[107] 2019-05-01[108] San Pedro, California Active service[52]
Joseph Doyle WPC-1133 2019-03-21[109] 2019-06-08[110] San Juan, Puerto Rico Active service[52]
William Hart WPC-1134 2019-05-23[111] 2019-09-26[112] Honolulu, Hawaii Active service[52]
Angela McShan WPC-1135 2019-08-01[113] 2019-10-26[114] Cape May, New Jersey Active service[52]
Daniel Tarr WPC-1136 2019-11-07[115][116] 2020-01-10[117] Galveston, Texas Active service[118][52]
Edgar Culbertson WPC-1137 2020-02-06[119] 2020-06-11[120] Galveston, Texas Active service[52]
Harold Miller WPC-1138 2020-04-02[121] 2020-07-15[122] Galveston, Texas Active service[118][52]
Myrtle Hazard WPC-1139 2020-05-28[123] 2021-07-29[124] Santa Rita, Guam Active service[52]
Oliver Henry WPC-1140 2020-07-30[125] 2021-07-29[124] Santa Rita, Guam Active service[52]
Charles Moulthrope WPC-1141 2020-10-22[126] 2021-01-21[127] Manama, Bahrain Active service[52]
Robert Goldman WPC-1142 2020-12-21[128] 2021-03-12[129] Manama, Bahrain Active service[52]
Frederick Hatch WPC-1143 2021-02-10[130] 2021-07-29[124] Santa Rita, Guam Active service[52]
Glen Harris WPC-1144 2021-04-22[131] 2021-08-06[132] Manama, Bahrain Active service[52]
Emlen Tunnell WPC-1145 2021-07-01[133] 2021-10-15[134] Manama, Bahrain Active service[52]
John Scheuerman WPC-1146 2021-10-22[135] 2022-02-23[136] Manama, Bahrain Active service[52]
Clarence Sutphin Jr. WPC-1147 2022-01-06[137] 2022-04-21[138] Manama, Bahrain Active service[52]
Pablo Valent WPC-1148 2022-03-17[139] 2022-05-11[140] St. Petersburg, Florida Active service[52]
Douglas Denman WPC-1149 2022-05-26[141][35] 2022-09-28[142] Ketchikan, Alaska Active service[52]
William Chadwick WPC-1150 2022-08-04[143] 2022-11-10[144] Boston, Massachusetts Active service[52]
Warren Deyampert WPC-1151 2022-12-22[145] 2023-03-30[146] Boston, Massachusetts Active service[52]
Maurice Jester WPC-1152 2023-03-02[147] 2023-06-02[148] Boston, Massachusetts Active service[52]
John Patterson WPC-1153 2023-05-11[149] 2023-08-10[150] Boston, Massachusetts Active service[52]
William Sparling WPC-1154 2023-07-20[151] 2023-10-19[152] Boston, Massachusetts Active service[52]
Melvin Bell WPC-1155 2023-11-16[153] 2024-03-28[154] Boston, Massachusetts Active service[52]
David Duren WPC-1156 2024-03-14[155] 2024-06-27[156] Astoria, Oregon Active service[52]
Florence Finch WPC-1157 2024-06-13[157] 2024-10-24[158] Astoria, Oregon Active Service[158]
John Witherspoon WPC-1158 2024-10-24 Kodiak, Alaska Under construction[52][159]
Earl Cunningham WPC-1159 2024 Kodiak, Alaska Under construction[52][160]
Frederick Mann WPC-1160 2024 First Kodiak, then Seward, Alaska Under contract[52]
Olivia Hooker WPC-1161 2025 Under contract[52][32]
Vincent Danz WPC-1162 2025 Under contract[52][32]
Jeffrey Palazzo WPC-1163 2025 Under contract[52][32]
Marvin Perrett WPC-1164 2025 Under contract[52][32]
TBD WPC-1165 2025 Under contract[36]
TBD WPC-1166 Under contract[38]
TBD WPC-1167 Under contract[38]

Operational histories

[edit]
Video was released when USCGC William Trump conducted a 20-hour pursuit of a high-speed 35 ft (11 m) center console boat stolen from Fort Myers, Florida, in December 2015.[161][162]

Press coverage of the vessels' operational histories suggests they have been effective at interdicting refugees who resort to dangerous overloaded small boats, and effective at capturing drug smugglers.[163][164][165][166][167][168][169][170][171][172][173][174][175][176][excessive citations]

The cutters have intercepted smugglers carrying large shipments of drugs.[177] In February 2017 Joseph Napier intercepted a shipment of over four tons of cocaine, reported to be the largest drug-bust in the Atlantic Ocean since 1999.

Cutters are given tasks like looking for shipping containers full of toxic cargo that have fallen from container ships, as USCGC Margaret Norvell did in December 2015, when 25 containers fell from the barge Columbia Elizabeth.[178][179] Similarly, Charles Sexton helped search for the freighter El Faro when she was lost at sea during Hurricane Joaquin in October 2015.[180]

In 2018 and 2019 Oliver Berry and Joseph Gerczak made voyages beyond the design range, on missions from Hawaii to the Marshall Islands and American Samoa.[181][182] Both voyages took nine days.

In August 2022, one of the ships in the Sentinel class, Oliver Henry, was stuck in the Solomon Islands after the country's government failed to respond to a fuel request.[183]

In February 2024, Clarence Sutphin Jr. intercepted a shipment of weaponry on its way to the Houthi militia in the Red Sea.[184]

Namesakes

[edit]

Charles "Skip" W. Bowen, who was then the Master Chief Petty Officer of the Coast Guard, is credited with leading the initiative of naming the vessels after enlisted rank individuals who served heroically in the Coast Guard or one of its precursor services.[185] Originally, the first vessel of the class was to be named USCGC Sentinel.[186]

In October 2010 the Coast Guard named the first fourteen individuals the vessels will be named after, and has provided biographies of them. [187][188][189] They are: Bernard C. Webber, Richard Etheridge, William Flores, Robert Yered, Margaret Norvell, Paul Clark, Charles David Jr, Charles Sexton, Kathleen Moore, Joseph Napier, William Trump, Isaac Mayo, Richard Dixon, Heriberto Hernandez. A second group of eleven names was announced on April 2, 2014.[190][failed verification]

In 2013 the name of Joseph Napier was reassigned to WPC-1115 when WPC-1110 was named after the recently deceased Commander Raymond Evans. The other ten new namesakes were: Winslow W. Griesser, Richard H. Patterson, Joseph Tezanos, Rollin A. Fritch, Lawrence O. Lawson, John F. McCormick, Bailey T. Barco, Benjamin B. Dailey, Donald R. Horsley, and Jacob L. A. Poroo. The 17th cutter (ex-USCGC Richard Patterson) was renamed as Donald Horsley after request of the Patterson Family, and the 24th cutter (ex-USCGC Donald Horsley) then was renamed as Oliver Berry.

In July 2014, Coast Guard Commandant Paul Zukunft announced that the Coast Guard would name an additional cutter after Senior Chief Petty Officer Terrell Horne, the first Coast Guard member to be murdered in the line of duty since 1927.[191][192][193]

In February 2015, the Coast Guard publicized ten more names tentatively assigned to cutters 26 through 35.[194] They were: Joseph Gerczak, Richard T. Snyder, Nathan Bruckenthal, Forrest O. Rednour, Robert G. Ward, Terrell Horne III, Benjamin A. Bottoms, Joseph O. Doyle, William C. Hart, and Oliver F. Berry.

In December 2017, the Coast Guard announced the names of the 35th through 54th cutters.[195] The twenty namesakes are: Angela McShan, Daniel Tarr, Edgar Culbertson, Harold Miller, Myrtle Hazard, Oliver Henry, Charles Moulthrope, Robert Goldman, Frederick Hatch, Glen Harris, Emlen Tunnell, John Scheuerman, Clarence Sutphin, Pablo Valent, Douglas Denman, William Chadwick, Warren Deyampert, Maurice Jester, John Patterson, and William Sparling. The 35th cutter (ex-USCGC Oliver Berry) is to be named as Angela McShan since the 24th cutter (ex-USCGC Donald Horsley) was renamed as Oliver Berry.

In October 2019, the Coast Guard named the namesakes of cutters 55 through 64. They are: Melvin Bell, David Duren, Florence Finch, John Witherspoon, Earl Cunningham, Frederick Mann, Olivia Hooker, Vincent Danz, Jeffrey Palazzo, and Marvin Perrett.[196]

Notes

[edit]
  1. ^ Originally was to be named Joseph Napier, but, in 2013, hull number WPC-1110 was reassigned to the name Raymond Evans to honor recently deceased Commander Raymond Evans. WPC-1115 became Joseph Napier.

References

[edit]
  1. ^ a b "Sentinel Class". Naval Technology. Archived from the original on December 10, 2018. Retrieved February 9, 2018.
  2. ^ Mark D. Faram (May 9, 2013). "Fast Response Cutters: Enhanced capability and national security delivered". Defense Media Network. Archived from the original on October 9, 2013. Retrieved August 23, 2014.
  3. ^ Christopher P. Cavas (September 30, 2009). "U.S. Coast Guard Chooses New Patrol Boat". Defense News. Archived from the original on May 23, 2011. Retrieved October 13, 2009.
  4. ^ "Fast Response Cutter (FRC)". Integrated Deepwater System Program. Archived from the original on June 3, 2007. Retrieved September 1, 2007.
  5. ^ "Department of Homeland Security, U.S. Coast Guard, Budget Overview, Fiscal Year 2021, Congressional Justification" (PDF). Department of Homeland Security. 2020. p. 27. Archived (PDF) from the original on February 11, 2020. Retrieved February 13, 2020. The new robotic patrol boat could borrow the hull of the Coast Guard's 350-ton-displacement Sentinel-class cutter, Fox pointed out.
  6. ^ Government Product News (April 19, 2007). "Coast Guard Reassigns Deepwater Replacement Patrol Boat Acquisition Project". American City & County. Archived from the original on January 13, 2017. Retrieved July 23, 2016.
  7. ^ "Coast Guard reassigns Deepwater replacement patrol boat acquisition project". United States Coast Guard. March 14, 2007. Archived from the original on September 27, 2007. Retrieved September 1, 2007.
  8. ^ "U.S. Coast Guard Running Out of Ships". Strategy Page. March 25, 2007. Archived from the original on December 17, 2019. Retrieved February 14, 2020.
  9. ^ "Surface Forces: Bad Decisions". Strategy Page. November 19, 2019. Archived from the original on December 4, 2019. Retrieved November 19, 2019. The Dutch design was selected in 2008 because in 2007, the Coast Guard was finally forced to admit defeat in its effort to build an earlier design for Fast Response Cutters. The shipbuilders (Lockheed Martin and Northrop Grumman) screwed up, big time. While the Coast Guard shares some of the blame, for coming up with new concepts that didn't work out, the shipbuilders are the primary culprits because they are, well, the shipbuilding professionals and signed off on the Coast Guard concepts. Under intense pressure from media, politicians, and the shame of it all, the Coast Guard promptly went looking for an existing (off-the-shelf) design and in a hurry. That had become urgent because of an earlier screw-up.
  10. ^ "Damen Stan Patrol Vessel 4708: Lillian Ngoyi" (PDF). Damen Group. Archived from the original (PDF) on July 20, 2011. Retrieved October 11, 2009.
  11. ^ "Acquisition Directorate: Newsroom". United States Coast Guard. Archived from the original on October 31, 2008.
  12. ^ "SENTINEL Class Patrol Boat: Media Round Table" (PDF). United States Coast Guard. September 30, 2008. Archived from the original (PDF) on February 20, 2009. Retrieved October 8, 2009.
  13. ^ "New Coast Guard cutter steams into Miami". Miami Herald. February 9, 2012. Archived from the original on February 10, 2012. Retrieved April 27, 2012.
  14. ^ "ALCOAST 132/10 – COMDTNOTE 1000 – SUBJ: Naming of the First Sentinel Class Cutter". USCG. Archived from the original on May 15, 2017. Retrieved April 25, 2014.
  15. ^ a b c d e Grace Jean (December 28, 2015). "US Coast Guard accepts 16th fast response cutter". Washington, DC: Jane's Fighting Ships Yearbook 2015. Archived from the original on December 29, 2015. With six cutters operating out of Miami, Florida, and six based in Key West, plus the two in San Juan, the USCG has 14 FRCs in service.
  16. ^ "USCG: Acquisition Newsroom". Uscg.mil. Archived from the original on February 14, 2017. Retrieved April 25, 2014. On Dec. 15, 2009, the Coast Guard awarded a $141 million contract option to Bollinger to begin low-rate initial production on three additional Sentinel-class FRCs. The current contract is worth up to $1.5 billion if all options for 34 cutters are exercised. The Coast Guard plans to build a total of 58 Sentinel-class FRCs.
  17. ^ "Coast Guard to Acquire 6 More Sentinel-class Boats". Marine Link. September 26, 2013. Archived from the original on September 29, 2013. Retrieved September 26, 2013.
  18. ^ "Bollinger Shipyards Gets Contract for Remaining 26 Coast Guard Cutters". Military.com. May 5, 2016. Archived from the original on July 10, 2016. Retrieved July 23, 2016.
  19. ^ "Acquisition Update: Coast Guard Accepts 18th Fast Response Cutter". United States Coast Guard. June 23, 2016. Archived from the original on August 16, 2016. Retrieved July 23, 2016.
  20. ^ "FRCs aid in hurricane response, Coast Guard FRC program grows" (Press release). Washington, DC: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. September 10, 2018. Retrieved August 10, 2024.
  21. ^ "Coast Guard exercises contract option for FRCs 51-56" (Press release). Washington, DC: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. August 6, 2019. Retrieved August 12, 2024.
  22. ^ Gain, Nathan (September 28, 2020). "Four more Sentinel-class fast response cutters for the US Coast Guard". Naval News. Retrieved October 31, 2020.
  23. ^ "U.S. Coast Guard will base two new cutters in Astoria". Archived from the original on August 4, 2018. Retrieved June 5, 2018.
  24. ^ "Four new Coast Guard cutters bound for California duty". Archived from the original on August 4, 2018. Retrieved August 3, 2018.
  25. ^ "Alaska delegation cheers new coast guard ships to patrol state waters". Archived from the original on May 29, 2018. Retrieved June 5, 2018.
  26. ^ "Fast Response Cutter" (PDF). Retrieved January 4, 2020.
  27. ^ "U.S. Coast Guard commissions 45th fast response cutter". NavalNews. October 19, 2021. Retrieved November 16, 2021.
  28. ^ "House, Senate Defense Bills Tough on Littoral Combat Ship Programs". news.usni.org. June 13, 2019. Archived from the original on June 15, 2019. Retrieved June 15, 2019.
  29. ^ Collin Fox (February 2019). "Two Birds with One Stone: A New Patrol Craft and Unmanned Surface Vessel". United States Naval Institute Proceedings. Retrieved February 20, 2020. The Navy should latch onto the Coast Guard's WPC program to acquire a PC(R) that could also serve as a MDUSV development platform and, eventually, a MDUSV... A vessel based on the WPC would take advantage of the Coast Guard's sunk development costs and production learning curve, while also leveraging multiyear procurement to achieve still greater cost savings.
  30. ^ David Axe (February 20, 2020). "Forget Big Ships: These Cyclone Patrol Boats Would Fight The Navy's War On Iran". National Interest magazine. Retrieved February 20, 2020. If the United States and Iran go to war in the Persian Gulf, the U.S. Navy's smallest warships could be the first to see combat.
  31. ^ Wilson, Alex (August 11, 2021). "Coast Guard orders four more $65 million fast-response cutters from Louisiana shipbuilder". Stars and Stripes. Retrieved August 27, 2022.
  32. ^ a b c d e "Coast Guard orders four more $65 million fast-response cutters from Louisiana shipbuilder". military.com. Archived from the original on August 24, 2021. Retrieved August 24, 2021.{{cite web}}: CS1 maint: unfit URL (link)
  33. ^ "Coast Guard awards contract to expand East Tongue Point facilities". Coast Guard News. July 12, 2022. Retrieved August 27, 2022.
  34. ^ "Government Spending Bill Is Signed into Law: What You Need to Know". nrdc.org. March 18, 2022. Retrieved August 27, 2022.
  35. ^ a b "Coast Guard Accepts Delivery of 49th Fast Response Cutter Douglas Denman". Seapower. March 18, 2022. Retrieved August 27, 2022.
  36. ^ a b "Coast Guard exercises contract option to build one fast response cutter". dcms.uscg.mil. August 12, 2022. Retrieved August 27, 2022. The Coast Guard exercised a contract option Aug. 9 for production of one Sentinel-class fast response cutter (FRC)...This option brings the total number of FRCs under contract with Bollinger to 65...The FRC built under this option will be delivered in 2025.
  37. ^ "Coast Guard exercises contract option to build one fast response cutter" (Press release). Washington, DC: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. August 12, 2022. Retrieved August 13, 2024.
  38. ^ a b c "U.S. Coast Guard Awards Bollinger Shipyards 2 Fast Response Cutters". Biz New Orleans. May 14, 2024. Retrieved June 15, 2024. The U.S. Coast Guard has exercised a contract option to award Bollinger Shipyards two additional Sentinel-Class Fast Response Cutters. This announcement brings the total number of FRCs awarded to Bollinger up to 67 vessels since the program's inception.
  39. ^ "Coast Guard exercises contract option to build two fast response cutters" (Press release). Defense Media Activity. Acquisition Directorate, U.S. Coast Guard U.S. Department of Homeland Security. May 16, 2024. Retrieved August 13, 2024.
  40. ^ "Fast Response Cutter" (PDF). USCG.mil. The United States Coast Guard. Archived (PDF) from the original on February 14, 2017. Retrieved February 11, 2017.
  41. ^ "Short Range Prosecutor (SRP)". Integrated Deepwater System Program. Archived from the original on May 3, 2007. Retrieved September 1, 2007.
  42. ^ "Bollinger awarded potential $1.5 billion FRC contract". Marine Log. September 26, 2009. Archived from the original on January 4, 2010. Retrieved October 11, 2009.
  43. ^ "U.S. Coast Guard's Acquisition of the Sentinel Class – Fast Response Cutter" (PDF). www.oig.dhs.gov. Department of Homeland Security. Archived (PDF) from the original on April 27, 2017. Retrieved September 25, 2019.
  44. ^ "Military & Government Vessels". bollingershipyards.com. Archived from the original on 11 August 2017. Retrieved 10 August 2017.
  45. ^ "USCG Fast Response Cutter B Class (FRC-B)". CiteSeerX 10.1.1.173.4057. {{cite journal}}: Cite journal requires |journal= (help)
  46. ^ "Systems approach to designing a maritime Phase Zero Force for the year 2020" (PDF). calhoun.nps.edu. Archived (PDF) from the original on January 13, 2018. Retrieved January 12, 2018. Design features include reduced signature through shaping
  47. ^ a b c Jacqueline L. Urgo (November 19, 2016). "Coast Guard to get 'game changer' cutter to save lives and catch criminals". Philadelphia Inquirer. Archived from the original on November 20, 2016. Retrieved February 19, 2021. Although the cutter is far from luxurious, its crew quarters provide slightly more room and comfort than earlier models, with larger staterooms, more toilets and sinks, greater storage space, and DirecTV access in the mess areas.
  48. ^ Mickey McCracker (February 7, 2013). "Coast Guard Looks for Small Biz to Support Design Review of Fast Response Cutters". Homeland Security Today. Archived from the original on April 21, 2013. Retrieved February 8, 2013.
  49. ^ Stone, Eric (September 28, 2022). "New Coast Guard cutter Douglas Denman enters service after commissioning ceremony in Ketchikan". KRBD, Rainbird Community Radio. Retrieved October 31, 2022.
  50. ^ "Coast Guard Cutter Douglas Denman arrives in Alaska". U.S. Coast Guard 17th District Alaska. August 19, 2022. Retrieved October 31, 2022.
  51. ^ "Report to Congress on Coast Guard Cutter Procurement". USNI News. March 19, 2024. Retrieved June 15, 2024.
  52. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax ay az ba bb bc bd be bf bg bh bi bj Fagan, Linda L. (November 15, 2023). Fast Response Cutter Laydown (PDF) (Report). U. S. Coast Guard. pp. 4–5. Retrieved July 7, 2024.
  53. ^ "Cutter Richard Etheridge in commission". United States Coast Guard. August 3, 2012. Archived from the original on December 12, 2012. Retrieved October 23, 2012. Crewmembers aboard the Coast Guard Cutter Richard Etheridge reveal the ship's name placard during the cutter's commissioning.
  54. ^ "Photo Release: Coast Guard Cutter William Flores commissioned in Tampa, Florida". Tampa Bay, Florida: United States Coast Guard. November 3, 2012. Archived from the original on November 7, 2012. Retrieved November 12, 2012. The William Flores' location of the commissioning honored the history of the cutter's namesake. On the night of Jan. 28, 1980, Coast Guard Seaman William "Billy" Flores, 18, died while assisting his shipmates after the Coast Guard Cutter Blackthorn, collided with a large merchant vessel in the Tampa Bay ship channel.
  55. ^ "Bollinger delivers the CGC Robert Yered". Professional Mariner. San Diego: Maritime Publishing. November 26, 2012. Retrieved June 22, 2024.
  56. ^ "Bollinger Deliver [sic] Fifth Fast Response Cutter". Marine Link. March 25, 2013. Archived from the original on March 4, 2016. Retrieved April 24, 2013. The 154 foot patrol craft 'Margaret Norvell' is the fifth vessel in the Coast Guard's Sentinel-class FRC program. To build the FRC, Bollinger Shipyards used a proven, in-service parent craft design based on the Damen Stan Patrol Boat 4708.
  57. ^ "Commissioning ceremony for Coast Guard Cutter Margaret Norvell". Coast Guard News. May 30, 2013. Archived from the original on November 6, 2015. Retrieved May 31, 2013.
  58. ^ "Fast Response Cutter, Paul Clark, named after WWII hero, delivered to Coast Guard". Government Security News. May 22, 2013. Archived from the original on May 31, 2013. Retrieved May 31, 2013. The Coast Guard accepted delivery of Paul Clark, the sixth vessel in the Coast Guard's Sentinel-class Fast Response Cutter (FRC) recapitalization project on May 18 in Key West, Florida.
  59. ^ "Bollinger Shipyards delivers seventh Sentinel Class cutter". Lockport, Louisiana: Marine Log. August 20, 2013. Archived from the original on August 27, 2013. Retrieved August 20, 2013. The 154-foot patrol craft Charles David Jr. is the seventh vessel in the Coast Guard's Sentinel-class FRC program. To build the FRC, Bollinger Shipyards used a proven, in-service parent craft design based on the Damen Stan Patrol Boat 4708. It has a flank speed of 28 knots, state of the art command, control, communications and computer technology, and a stern launch system for the vessels 26 foot cutter boat. The FRC has been described as an operational "game changer," by senior Coast Guard officials.
  60. ^ Keith Magill (August 20, 2013). "Bollinger delivers latest Coast Guard cutter". Daily Comet. Archived from the original on March 4, 2016. Retrieved August 21, 2013. The 154-foot Charles David Jr. was delivered Friday to the 7th Coast Guard District in Key West, Florida, where it will be commissioned in November.
  61. ^ "U.S. Coast Guard commissions first Sentinel class Fast Response Cutter Homeported in Key West, Florida". November 26, 2013. Archived from the original on December 1, 2013. Retrieved November 27, 2013.
  62. ^ Jed Lipinski (December 10, 2013). "Bollinger delivers eighth Fast-Response Cutter to U.S. Coast Guard". New Orleans Times Picayune. Lockport, Louisiana. Archived from the original on December 11, 2013. Retrieved December 11, 2013. The vessel was delivered to the 7th Coast Guard District in Key West, Fla., where the Coast Guard expects to commission it in March 2014.
  63. ^ "Coast Guard's Eighth FRC Enters Service". Marine Link. March 14, 2014. Archived from the original on March 15, 2014. Coast Guard Cutter Charles Sexton was commissioned into service March 8 at Coast Guard Sector Key West, Fla. The Sexton is the second of six Fast Response Cutters to be homeported in Key West, and the eighth vessel to be delivered through the Coast Guard's Sentinel-class FRC recapitalization project.
  64. ^ "Bollinger Delivers 9th USCG Fast Response Cutter". Marine Link. March 28, 2014. Archived from the original on March 28, 2014. The Coast Guard took delivery on March 28, 2014 in Key West, Florida and is scheduled to commission the vessel in Key West, Florida during May, 2014.
  65. ^ "Bollinger Delivers 10th Coast Guard FRC". Maritime Executive. June 25, 2014. Archived from the original on June 26, 2014. Retrieved June 25, 2014. The Coast Guard took delivery on June 25, 2014 in Key West, Florida and is scheduled to commission the vessel in Key West, Florida during September, 2014.
  66. ^ "Key West Navy League Commissioning Committee Welcomes You". Key West Navy League. Archived from the original on August 21, 2014. Retrieved August 20, 2014. The first of these cutters, the CGC CHARLES DAVID JR, was commissioned at sunset on Saturday, 16 November 2013, the second CGC CHARLES SEXTON on March 8, 2014, the CGC KATHLEEN MOORE on May 10th, the CGC RAYMOND EVANS on 6 September 2014, and the latest CGC WILLIAM TRUMP on 24 January 2015 at US Coast Guard Sector Key West.
  67. ^ "Bollinger delivers FRC named for Normandy hero". Marine Log. November 25, 2014. Archived from the original on November 30, 2014. Retrieved November 26, 2014. We are extremely happy to announce the delivery of the latest FRC built by Bollinger, the William Trump, to the 7th Coast Guard District in Key West, Florida," said Bollinger Chief Operating Officer, Ben Bordelon. "We are looking forward to honoring and celebrating the heroic acts of William Trump at the vessel's commissioning.
  68. ^ Keith MaGill (November 25, 2014). "Local shipyard delivers latest Coast Guard cutter". Daily Comet. Archived from the original on December 4, 2014. Retrieved November 26, 2014.
  69. ^ Eric Haus (November 25, 2014). "Bollinger Delivers 11th FRC to the U.S. Coast Guard". Marine Link. Archived from the original on December 4, 2014. Retrieved November 26, 2014.
  70. ^ "Bollinger Shipyards delivers Coast Guard cutter". Kentucky Advocate. November 25, 2014. Archived from the original on November 26, 2014. Retrieved November 26, 2014.
  71. ^ "Bollinger delivers FRC Isaac Mayo". Professional Mariner. January 13, 2015. Retrieved July 9, 2024.
  72. ^ "Acquisition Update: Coast Guard Commissions 12th Fast Response Cutter". United States Coast Guard. March 30, 2015. Archived from the original on April 3, 2015. Retrieved February 27, 2016. The Coast Guard commissioned Isaac Mayo, the 12th fast response cutter and sixth to be based in Key West, Florida, March 28, 2015.
  73. ^ "Bollinger delivers FRC Richard Dixon". Marine Log. April 15, 2015. Archived from the original on April 17, 2015. We are very pleased to announce the delivery of the latest FRC built by Bollinger, the Richard Dixon, to the Seventh Coast Guard District in Puerto Rico," said Bollinger's President and CEO, Ben Bordelon. "We are looking forward to honoring and celebrating the heroic acts of Richard Dixon at the vessel's commissioning.
  74. ^ "Bollinger delivers FRC Heriberto Hernandez". Marine Log. July 30, 2015. Archived from the original on August 4, 2015. Retrieved August 5, 2015. The Coast Guard took delivery on July 30, 2015 in Key West, FL, and is scheduled to commission the vessel in Puerto Rico during October, 2015.
  75. ^ Sig Christenson (October 16, 2015). "Coast Guard's newest cutter named for Kennedy High School hero". San Antonio Express-News. Archived from the original on March 5, 2016. Retrieved October 16, 2015.
  76. ^ "Bollinger delivers FRC Joseph Napier". Marine Log. October 20, 2015. Archived from the original on December 10, 2018. Retrieved October 20, 2015. Bollinger Shipyards, Lockport, LA, has delivered the Joseph Napier, the 15th Fast Response Cutter (FRC) to the United States Coast Guard. The Coast Guard took delivery on October 20, 2015 in Key West, Florida, and is scheduled to commission the vessel in Puerto Rico during January, 2016.
  77. ^ "Bollinger Shipyards delivers latest Coast Guard cutter". Houma Today. March 8, 2016. Archived from the original on March 10, 2016. Retrieved March 9, 2016. The 154-foot patrol craft is the 17th vessel in the Coast Guard's Sentinel-class FRC program.
  78. ^ "Coast Guard commissions U.S. Coast Guard Cutter Joseph Tezanos in San Juan, Puerto Rico". Coast Guard News. August 26, 2016. Archived from the original on August 28, 2016. Retrieved August 26, 2016.
  79. ^ "Acquisition update: Coast Guard commissions 20th fast response cutter" (Press release). Cape May, New Jersey: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. March 18, 2017. Retrieved August 9, 2024.
  80. ^ Sentinel Class vessel to be based in Ketchikan Archived 2018-02-28 at the Wayback Machine. Ketchikan Daily News, 17 December 2016
  81. ^ Charles Michel (April 12, 2017). "A first for Alaska, a first for the West Coast". Juneau Empire. Archived from the original on April 13, 2017. Retrieved April 13, 2017. Today we usher in a new era for the Coast Guard in Alaska. At a ceremony in Ketchikan, Coast Guard Cutter John McCormick will officially enter the fleet...While we're commissioning this Fast Response Cutter today, it is the first of six of its kind that will call Alaska home.
  82. ^ Eric Haun (February 8, 2017). "FRC Bailey Barco Delivered to the USCG". Marine link. Archived from the original on February 8, 2017. Retrieved February 9, 2017. The U.S. Coast Guard has taken delivery of USCGC Bailey Barco on February 7, 2017 in Key West, Fla. The vessel is scheduled to be commissioned in Ketchikan, Alaska in June, 2017.
  83. ^ "Bollinger delivers latest Coast Guard cutter". Houma Today. February 8, 2017. Archived from the original on February 9, 2017. Retrieved December 15, 2016. This vessel is named after Barco, who was awarded the Gold Lifesaving Medal on Oct. 7, 1901, for his heroic action to rescue the crew of the Jennie Hall, a schooner that had been grounded during a winter storm off Virginia Beach, Va.
  84. ^ "Acquisition update: Coast Guard commissions 22nd fast response cutter" (Press release). Juneau, Alaska: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. June 15, 2017. Retrieved August 9, 2024.
  85. ^ Eric Haun (April 20, 2017). "Bollinger Delivers USCGC Benjamin Dailey". Marine Link. Archived from the original on April 21, 2017. The Coast Guard took delivery of the 154-foot patrol craft on April 20, 2017 in Key West, Fla. The vessel's commissioning is scheduled for July 4, 2017 in Pascagoula, Miss.
  86. ^ Ken Hocke (April 21, 2017). "Bollinger delivers latest fast response cutter to USCG". WorkBoat magazine. Archived from the original on April 22, 2017. Retrieved April 21, 2017. Bollinger Shipyards, Lockport, La., has delivered the 154'x25'5″x9'6″ Benjamin Dailey to the Coast Guard, the 23rd fast response cutter (FRC).
  87. ^ "Bollinger delivers the 23rd FRC to USCG". Port News. April 21, 2017. Archived from the original on April 22, 2017. This vessel is named after Coast Guard Hero Benjamin Dailey. Dailey, Keeper of the Cape Hatteras Life-Saving Station, was awarded the Gold Lifesaving Medal on April 24, 1885 for his exceptional bravery in one of the most daring rescues by the Life-Saving Service.
  88. ^ "Coast Guard commissions 23rd fast response cutter" (Press release). Pascagoula, Mississippi: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. July 4, 2017. Retrieved August 9, 2024.
  89. ^ Fagan, Linda L. (November 15, 2023). Fast Response Cutter Laydown (PDF) (Report). U. S. Coast Guard. p. 2. Retrieved June 21, 2024. One ship, Coast Guard Cutter (CGC) Benjamin Dailey (WPC 1123), was severely damaged in a shipyard fire in December 2021. Coast Guard subject matter experts determined that repair of the vessel was not feasible. If repaired, the cutter would not have fulfilled its expected service life and would have incurred higher operational costs. CGC Benjamin Dailey has been de-commissioned.
  90. ^ Berdychowski, Bernadette (December 11, 2021). "Coast Guard cutter undergoing repairs catches fire at Port Tampa Bay". Tampa Bay Times. Port Tampa Bay. Retrieved July 7, 2024.
  91. ^ "Acquisition update: Coast Guard accepts 24th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. June 28, 2017. Retrieved August 9, 2024.
  92. ^ "Coast Guard commissions 24th fast response cutter" (Press release). Honolulu, Hawaii: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. November 1, 2017. Retrieved August 9, 2024.
  93. ^ "USCG receives Fast Response Cutter, USCGC Jacob Poroo". Naval Today. Key West, Florida. September 7, 2017. Retrieved August 1, 2024.
  94. ^ "Coast Guard commissions 25th fast response cutter" (Press release). New Orleans, Louisiana: Defense Media Activity. Acquisition Directorate, U.s. Coast Guard, U.S. Department of Homeland Security. December 8, 2017. Retrieved August 2, 2024.
  95. ^ "Coast Guard accepts 26th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. November 9, 2017. Retrieved August 9, 2024.
  96. ^ "Coast Guard commissions 26th fast response cutter" (Press release). Honolulu, Hawaii: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. March 12, 2018. Retrieved August 10, 2024.
  97. ^ "U.S. Coast Guard Accepts 27th Fast Response Cutter, USCGC Richard Snyder". DefPost. February 10, 2018. Archived from the original on February 11, 2018. Retrieved February 10, 2018. USCGC Richard Snyder will be the first Sentinel-class cutter (FRC) stationed in Atlantic Beach, North Carolina, and will be commissioned in April.
  98. ^ "Coast Guard commissions 27th fast response cutter" (Press release). Atlantic beach, North Carolina: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. April 20, 2018. Retrieved August 10, 2024.
  99. ^ "Coast Guard accepts 28th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. March 29, 2018. Retrieved August 10, 2024.
  100. ^ "Coast Guard commissions 28th fast response cutter" (Press release). Alexandria, Virginia: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. July 25, 2018. Retrieved August 10, 2024.
  101. ^ "Coast Guard accepts 29th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. June 7, 2018. Retrieved August 10, 2024.
  102. ^ "Coast Guard commissions first California FRC". November 9, 2018. Archived from the original on November 11, 2018. Retrieved November 10, 2018.
  103. ^ "Bollinger Shipyards delivers U.S. Coast Guard's 30th FRC". Archived from the original on August 28, 2018. Retrieved August 27, 2018.
  104. ^ "Coast Guard commissions 30th fast response cutter" (Press release). San Francisco, California: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. March 5, 2019. Retrieved August 12, 2024.
  105. ^ "U.S. Coast Guard takes delivery of FRC 31". Archived from the original on October 31, 2018. Retrieved October 30, 2018.
  106. ^ "Coast Guard commissions 31st fast response cutter" (Press release). San Pedro, California: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. March 22, 2019. Retrieved August 12, 2024.
  107. ^ "Coast Guard Accepts 32nd Fast Response Cutter". US Coast Guard Acquisition Directorate. Retrieved February 12, 2019.
  108. ^ "Coast Guard commissions 32nd fast response cutter" (Press release). San Pedro, California: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. May 2, 2019. Retrieved August 12, 2024.
  109. ^ "Coast Guard accepts 33rd fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. March 22, 2019. Retrieved August 12, 2024.
  110. ^ "Coast Guard Commissions New Fast-Response Cutter in San Juan". Sea Power. June 10, 2019. Retrieved June 10, 2019.
  111. ^ Hill, Mike. "Bollinger delivers Coast Guard cutter". Archived from the original on May 28, 2019. Retrieved May 28, 2019.
  112. ^ "Coast Guard commissions 34th fast response cutter" (Press release). Honolulu, Hawaii: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. September 27, 2019. Retrieved August 12, 2024.
  113. ^ "Bollinger Delivers USCGC Angela McShan". Archived from the original on August 2, 2019. Retrieved August 3, 2019.
  114. ^ Barlow, Bill (October 29, 2019). "CG Cutter McShan Commissioned". Cape May County Herald. Archived from the original on October 29, 2019. Retrieved October 29, 2019.
  115. ^ "Coast Guard accepts 36th fast response cutter". U.S. Coast Guard. November 9, 2019. Archived from the original on November 10, 2019. Retrieved November 12, 2019. The cutter will be the first of three planned FRCs stationed in Galveston, Texas.
  116. ^ Mike Hill (November 17, 2019). "Bollinger delivers Coast Guard cutter". Houma Today. Archived from the original on November 19, 2019. Retrieved December 4, 2019. Lockport-based Bollinger Shipyards delivered the USCGC Daniel Tarr, the 36th fast response cutter, to the U.S. Coast Guard on Nov. 7 in Key West, Florida.
  117. ^ "Coast Guard commissions Cutter Daniel Tarr in Galveston, Texas". coastguardnews.com/. Archived from the original on January 11, 2020. Retrieved January 11, 2020.{{cite web}}: CS1 maint: unfit URL (link)
  118. ^ a b "Sea Power - January 2019". Sea Power 2019 Almanac. January 2019. Archived from the original on February 26, 2019. Retrieved February 26, 2019.{{cite journal}}: CS1 maint: unfit URL (link)
  119. ^ "Coast Guard accepts delivery of Cutter Edgar Culbertson". Retrieved February 29, 2020.
  120. ^ "Coast Guard Cutter Edgar Culbertson commissioning". Retrieved June 11, 2020.
  121. ^ "Bollinger delivers 38th Fast Response Cutter to the USCG". April 6, 2020. Retrieved June 8, 2020.
  122. ^ "Coast Guard commissions 38th fast response cutter" (Press release). Galveston, Texas: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. July 17, 2020. Retrieved August 12, 2024.
  123. ^ "U.S. Coast Guard accepts 39th fast response cutter". June 2, 2020. Retrieved June 8, 2020.
  124. ^ a b c "US Coast Guard conducts triple commissioning". Dvids. Santa Rita, Guam: Defense Visual Information Distribution Service. July 29, 2021. Retrieved July 6, 2024. Adm. Karl Schultz, commandant, U.S. Coast Guard (USCG), offers remarks during a commissioning ceremony on U.S. Naval Base Guam July 29. The ceremony commissioned three new USCG sentinel-class fast response cutters stationed on Guam: USCG Cutter Myrtle Hazard, USCG Cutter Oliver Henry, and USCG Cutter Frederick Hatch.
  125. ^ "Coast Guard accepts 40th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. July 30, 2020. Retrieved August 13, 2024.
  126. ^ Keith Magill (October 22, 2020). "Lockport shipyard's latest Coast Guard cutter to serve overseas". Houma Today. Retrieved October 23, 2020. The Charles Moulthrope will be based in Manama, Bahrain, replacing a 110-foot Island Class Patrol Boat built by Bollinger 30 years ago. The new ship will support U.S. defense missions in southwest Asia, the Coast Guard's largest overseas presence.
  127. ^ "Coast Guard commissions 41st fast response cutter" (Press release). Portsmouth, Virginia: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. January 22, 2021. Retrieved August 13, 2024.
  128. ^ Kieth MaGill (December 21, 2020). "Latest Bollinger-built Coast Guard cutter destined for Middle East". Houma Today. Retrieved December 21, 2020.
  129. ^ "Coast Guard commissions 42nd fast response cutter". United States Coast Guard. Retrieved March 15, 2021.
  130. ^ Doornbos, Caitlyn. "Coast Guard receives newest fast-response cutter that will be homeported in Guam". Stars and Stripes. Retrieved February 11, 2021.
  131. ^ "Coast Guard accepts 44th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. April 22, 2021. Retrieved August 13, 2024.
  132. ^ Strong, Stacia (August 6, 2021). "U.S. Coast Guard commissions new cutter named after local WWII hero". Retrieved August 6, 2021.
  133. ^ "Coast Guard accepts 45th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. July 1, 2021. Retrieved August 13, 2024.
  134. ^ "Coast Guard commissions fast response cutter Emlen Tunnell". coastguardnews.com. October 15, 2021. Retrieved October 17, 2021.
  135. ^ "Bollinger Delivers USCGC John Scheuerman". MarineLink. October 22, 2021. Retrieved October 27, 2021.
  136. ^ "Coast Guard commissions 46th fast response cutter in Florida". U.S. Coast Guard. February 24, 2022. Retrieved March 2, 2022.
  137. ^ "Coast Guard accepts 47th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisitions Directorate, U.S. Coast Guard, U.S. Department of Homeland Security. January 7, 2022. Retrieved August 13, 2024.
  138. ^ "USCG commissions 47th fast response cutter in New York City". Naval News. April 28, 2022. Retrieved May 4, 2022.
  139. ^ "Coast Guard accepts 48th fast response cutter" (Press release). Key West, Florida: Defense Media Activity. Acquisition Directorate, U.S. Coast Guar,d U.S. Department of Homeland Security. March 22, 2022. Retrieved August 13, 2024.
  140. ^ "Coast Guard commissions Cutter Pablo Valent". coastguardnews.com. May 11, 2022. Retrieved May 28, 2022.
  141. ^ "Coast Guard Accepts 49th Fast Response Cutter". US Coast Guard Acquisition Directorate. Retrieved May 28, 2022.
  142. ^ "New Coast Guard cutter Douglas Denman enters service after commissioning ceremony in Ketchikan". KRBD Community Radio, Ketchican, Alaska. September 28, 2022. Retrieved September 29, 2022.
  143. ^ "Coast Guard accepts 50th fast response cutter". US Coast Guard Acquisition Directorate. Retrieved August 5, 2022.
  144. ^ "Coast Guard Cutter William Chadwick commissioned in Boston". coastguardnews.com. November 10, 2022. Retrieved November 11, 2022.
  145. ^ "Coast Guard accepts 51st fast response cutter". US Coast Guard Acquisition Directorate. December 22, 2022. Retrieved December 27, 2022.
  146. ^ "Coast Guard Cutter Warren Deyampert commissions in Boston" (Press release). United States Coast Guard. March 31, 2023. Retrieved March 1, 2023.
  147. ^ "Bollinger Shipyards Delivers 52nd Fast Response Cutter to U.S. Coast Guard". Bollinger Shipyards. March 2, 2023. Retrieved March 4, 2023.
  148. ^ "Coast Guard Cutter Maurice Jester commissions in Rhode Island" (Press release). United States Coast Guard. June 6, 2023. Retrieved June 6, 2023.
  149. ^ Fatima, Bahtić. "Bollinger Shipyards delivers US Coast Guard's 53rd fast response cutter". Naval Today. Retrieved May 17, 2023.
  150. ^ "Coast Guard commissions 53rd fast response cutter in Portland, Maine" (Press release). United States Coast Guard. August 11, 2023. Retrieved August 11, 2023.
  151. ^ "Coast Guard accepts 54th fast response cutter". US Coast Guard Acquisition Directorate. July 21, 2023. Retrieved July 22, 2023.
  152. ^ O'Brien, Kelly (October 19, 2023). "US Coast Guard commissions new fast response cutter in Portsmouth: Cutter named after Boatswain's Mate First Class William Sparling". WMUR 9 ABC. Retrieved October 21, 2023.
  153. ^ "55th fast response cutter accepted, to be homeported in Boston". US Coast Guard Acquisition Directorate. November 17, 2023. Retrieved November 18, 2023.
  154. ^ "US Coast Guard Commissions Fast Response Cutter Melvin Bell". Baird Maritime. March 29, 2024. Retrieved April 5, 2024.
  155. ^ "Coast Guard accepts 56th fast response cutter, to be homeported in Astoria, Oregon". US Coast Guard Acquisition Directorate. April 1, 2024. Retrieved April 5, 2024.
  156. ^ "Coast Guard commissions first Pacific Northwest-based Fast Response Cutter" (Press release). Astoria, Oregon: United States Coast Guard, Department of Homeland Security. June 28, 2024. Retrieved June 30, 2024.
  157. ^ "Coast Guard accepts 57th fast response cutter". US Coast Guard Acquisition Directorate. June 17, 2024. Retrieved June 17, 2024.
  158. ^ a b "Coast Guard commissions second Pacific Northwest-based Fast Response Cutter" (Press release). Seattle, Washington: United States Coast Guard, Department of Homeland Security. October 24, 2024. Retrieved October 24, 2024.
  159. ^ "ALCGENL 210/23 - AY24 Off Season Solicitation - CGC John Witherspoon (WPC-1158)". U.S. Coast Guard. October 11, 2023. Retrieved October 21, 2023.
  160. ^ "ALCGENL 134/24 - Subj: Critical Fill Solicitation - GM2 Independent Duty - CGC Earl Cunningham". U.S. Coast Guard. March 27, 2024. Retrieved April 5, 2024.
  161. ^ Michael Braun (December 27, 2015). "Trio nabbed in 20-hour high-speed boat chase". Fort Myers Press-News. Retrieved December 28, 2015. A 20-hour high-speed boat chase that at times resembled a James Bond movie ended about 65 miles west of Cuba on Christmas Eve when the three suspects just gave up, law enforcement officials said.[permanent dead link]
  162. ^ Alastair Jamieson (December 28, 2015). "Suspected Boat Thieves in Lee County, Florida, Lead Coast Guard on 345-Mile Chase". NBC News. Archived from the original on December 28, 2015. Retrieved December 28, 2015. Three suspected boat thieves led the Coast Guard on a 345-mile high-speed chase lasting nearly 20 hours before they were eventually captured off Mexico, officials in Florida said Sunday.
  163. ^ Susan Salisbury (April 10, 2016). "U.S. Coast Guard rescues 10 people from a sinking boat off Freeport". Palm Beach Post. Archived from the original on April 12, 2016. Retrieved April 11, 2016. The 10 survivors are believed to be migrants trying to get the United States from the Bahamas.
  164. ^ "U.S. Coast Guard Seizes 515 Kilos of Cocaine In 'Operation Caribbean Venture'". Space Coast Daily. November 22, 2015. Archived from the original on November 23, 2015. The four suspected smugglers were transferred to U.S. authorities for prosecution. The Friesland transferred the suspects and contraband to the Coast Guard Cutter Bernard C. Webber who was returning home from a successful counterdrug patrol off of Puerto Rico in support of Operation Unified Resolve.
  165. ^ Alfonso Chardy (December 20, 2015). "Details of cocaine bust near Dominican coast revealed". Miami Herald. Archived from the original on December 21, 2015. In this case, the interdiction operation involved the Coast Guard and the HNLMS Friesland, an offshore patrol vessel from the Royal Netherlands Navy.
  166. ^ Mark Barney (November 20, 2015). "Cutter Bernard C. Webber crew offloads $17M in seized cocaine in Miami". Miami Beach: Dvidshub. Archived from the original on April 7, 2016. Retrieved April 11, 2016. A Coast Guardsman offloads cocaine at Coast Guard Sector Miami Beach, Florida, Nov. 20, 2015.
  167. ^ Cheryl Pellerin (August 26, 2015). "DoD 101: Drugs, Thugs and the Coast Guard". Miami Beach: DoD News, Defense Media. Archived from the original on April 11, 2016. Retrieved April 11, 2016. On the Webber, Gould and Mike Cortese, commanding officer of Coast Guard Station Miami Beach, show the SLEP group what the Coast Guard does if it catches a target of interest making an illicit run from Bimini to the United States carrying migrants, drugs, money or guns.
  168. ^ "Coast Guard Seizes Cocaine and Marijuana". Maritime Executive. March 18, 2014. Archived from the original on March 19, 2014. Retrieved March 19, 2014. Crewmembers aboard the Coast Guard Cutter Richard Etheridge, a 154-foot Sentinel-class Fast Response Cutter homeported at Sector Miami, offload approximately 1,500 pounds of cocaine, worth an estimated wholesale value of $23 million, in St. Petersburg, Fla., Monday, March 17, 2014.
  169. ^ Mia Whylly (April 5, 2016). "34 Cubans apprehended over the weekend". The Freeport News. Archived from the original on April 8, 2016. Retrieved April 5, 2016. The United States Coast Guard Vessel (USCG) William Flores brought 12 Cuban migrants to the Lucayan Harbour Friday, April 1 and handed them over to a team of officers headed by SIO (Senior Immigration Officer) Jerome Hutcheson.
  170. ^ "Coast Guard Cutter Paul Clark repatriates 66 Cuban migrants". Miami, Florida: Coast Guard News. September 13, 2013. Archived from the original on March 18, 2015. Retrieved September 13, 2013. Crewmembers aboard the Coast Guard Cutter Paul Clark repatriated 66 Cuban migrants to Bahia de Cabañas, Cuba, Friday. This repatriation was a result of four separate migrant interdiction events this week.
  171. ^ "Cutter Charles Sexton Repatriates 39 Cuban Migrants". Military Daily. November 19, 2015. Archived from the original on November 21, 2015. Retrieved November 20, 2015. This repatriation is a result of three separate interdictions at sea in the south Florida Straits. These were interdictions of Cuban nationals attempting to illegally enter the United States on unseaworthy vessels commonly referred to as "rustics" or "chugs."
  172. ^ "US Coast Guard repatriates 85 Cuban migrants". Caribbean News Now. November 3, 2015. Archived from the original on April 23, 2016. Retrieved November 3, 2015. The Coast Guard Cutters Kathleen Moore, Marlin, along with numerous other Coast Guard patrol boats and aircraft, aggressively patrol the Florida Straits to detect and deter illegal and unsafe maritime migration. Safety of life at sea is always the Coast Guard's top priority.
  173. ^ "US Coast Guard seized $41M in drugs in Caribbean Sea". Jacksonville Sentinel. September 29, 2015. Archived from the original on March 10, 2016. Retrieved April 4, 2016. The agency's cutter Richard Dixon responded and seized the vessel after suspects tossed four packages into the water.
  174. ^ "DR migrants intercepted heading towards Puerto Rico". The Daily Herald. March 9, 2016. Archived from the original on March 11, 2016. Retrieved April 4, 2016. The USCG cutter Richard Dixon repatriated 24 migrants to the Dominican Republic.
  175. ^ "Dominican Republic Migrants Intercepted Heading Towards Puerto Rico". Curaçao Chronicle. March 9, 2016. Archived from the original on March 16, 2016. Retrieved April 4, 2016. The crew of the USCG Richard Dixon transferred the 25 migrants, who claimed to be citizens of the Dominican Republic, on board the cutter for safety and biometric processing.
  176. ^ "US Coast Guard rescues 14 Dominican boatpeople". Dominican Today. April 2, 2016. Archived from the original on April 23, 2016. Retrieved April 4, 2016. The Coast Guard Cutter Richard Dixon repatriated the remaining 14 Dominicans to the Dominican Republic during an at-sea transfer of the migrants to a Dominican Navy patrol vessel Friday just south of La Romana.
  177. ^ Susan Mohammed (March 2, 2017). "T&T Coast Guard in $837 million drug bust: ...fishing vessel intercepted off Suriname". Trinidad Express. Archived from the original on March 2, 2017. Retrieved March 3, 2017. The crew of the Napier, which is based in Port Canaveral, Florida, towed the 70-foot (21-meter) fishing vessel, the Lady Michelle, to St. Vincent and four men on board from Guyana were taken to the U.S. Virgin Islands to face possible criminal charges. The Coast Guard took the cocaine to Puerto Rico and turned it over to the U.S. Drug Enforcement Administration.
  178. ^ "Coast Guard Responds To Overboard Cargo Containers". CBS News. December 6, 2015. Archived from the original on December 8, 2015. Retrieved December 8, 2015.
  179. ^ "Coast Guard Responding to Cargo Container Incident". United States Coast Guard News. December 6, 2015. Retrieved December 8, 2015.
  180. ^ "Keys-based Coast Guard cutter joined search for 'El Faro'". Keysnet. October 10, 2015. Archived from the original on April 19, 2016. Retrieved April 11, 2016.
  181. ^ Amanda Levasseur, Sara Muir (August 1, 2018). "USCGC Oliver Berry crew sets new horizons for cutter operations". Dvidshub. Archived from the original on August 9, 2018. Retrieved August 9, 2018. In July Oliver Berry's crew set a new milestone by deploying over the horizon to the Republic of the Marshall Islands. The 4,400 nautical mile trip marked marking the furthest deployment of an FRC to date for the Coast Guard and is the first deployment of its kind in the Pacific.
  182. ^ Sara Muir (August 3, 2019). "USCGC Joseph Gerczak (WPC 1126) arrives in American Samoa on patrol". Dvidshub. Pago Pago. Archived from the original on August 5, 2019. Retrieved August 5, 2019. 'It was a good transit, the longest we've conducted yet, nine days at sea and we're proving the capabilities of these new cutters to operate over the horizon throughout the remote Pacific,' said Lt. James Provost, commanding officer of Joseph Gerczak.
  183. ^ "US Coast Guard vessel patrolling for illegal fishing unable to refuel in Solomon Islands". ABC News. August 25, 2022.
  184. ^ https://executivedigest.sapo.pt/noticias/marinha-americana-interceta-carregamento-de-armas-para-o-grupo-rebelde-houthi-vindo-do-irao (in portuguese)
  185. ^ Susan Schept (March 22, 2010). "Enlisted heroes honored". United States Coast Guard. Archived from the original on March 29, 2010. Retrieved February 1, 2013. After the passing of several well-known Coast Guard heroes last year, Master Chief Petty Officer of the Coast Guard Charles "Skip" Bowen mentioned in his blog that the Coast Guard does not do enough to honor its fallen heroes.
  186. ^ "U.S. Coast Guard announces name for first Sentinel-class cutter". March 22, 2010. Archived from the original on March 25, 2010. Retrieved February 1, 2013. Previously designated to be named the Coast Guard Cutter Sentinel, the cutter Bernard C. Webber will be the first of the service's new 153-foot patrol cutters. Coast Guard Commandant Admiral Thad Allen approved the change of the cutter's name to allow this class of vessels to be named after outstanding enlisted members who demonstrated exceptional heroism in the line of duty. This will be the first class of cutters to be named exclusively for enlisted members of the Coast Guard and its predecessor services.
  187. ^ Stephanie Young (October 27, 2010). "Coast Guard Heroes". United States Coast Guard. Archived from the original on November 27, 2012. Retrieved April 20, 2012.
  188. ^ Michael Valliant (November 2010). "Fast Response Cutters: The Heroes of the Coast Guard Fleet" (PDF). United States Coast Guard. p. 1. Archived from the original (PDF) on November 5, 2012. Retrieved August 5, 2011.
  189. ^ James Jay Carafano; Matt A. Mayer; Paul Rosenzweigis; Brian Slattery (February 15, 2013). "2013 Second Quadrennial Homeland Security Review". Archived from the original on February 24, 2013. Retrieved February 21, 2013.
  190. ^ "FRC Plan B: The Sentinel Class". Defense Industry Daily. May 2, 2014. Archived from the original on July 7, 2014. Retrieved April 3, 2014. All of these boats will be named after enlisted Coast Guard heroes, who distinguished themselves in USCG or military service. The first 25 have been named, but only 8 have been commissioned...
  191. ^ Christopher Lagan (July 30, 2014). "Coast Guard to name cutter for BMCS Terrell Horne III". Coast Guard Compass. Archived from the original on August 6, 2014. Retrieved August 2, 2014. The Commandant personally informed the Horne family earlier today a fast response cutter will bear Terrell Horne's name in honor of his sacrifice and faithful service in defense of his nation.
  192. ^ Kevin Roderick (February 5, 2014). "Mexican smugglers convicted in sea death of Coast Guard Chief Horne". LA Observed. Archived from the original on July 15, 2014. Retrieved August 6, 2014. Two Mexican nationals from Ensenada who were apprehended on a smuggling panga in December 2012 were convicted today in the death of Coast Guard Chief Petty Officer Terrell Horne III.
  193. ^ Kate Mather (February 15, 2014). "Mexican nationals convicted in 2012 death of Coast Guardsman". Los Angeles Times. Archived from the original on August 2, 2014. Retrieved August 6, 2014. Chief Petty Officer Terrell Horne III's death made him the first Coast Guardsman murdered in the line of duty since 1927, officials said. Horne, who spent 14 years with the Coast Guard, was posthumously promoted to the rank of senior chief petty officer.
  194. ^ "Acquisition Update: Coast Guard Reveals Names of FRCs 26-35". US Coast Guard. February 27, 2015. Archived from the original on March 5, 2015. Retrieved March 25, 2017. The Coast Guard recently announced the names of the 26th through 35th Sentinel-class fast response cutters through a series of posts on its official blog, the Coast Guard Compass.
  195. ^ "Coast Guard Aligns Names with Hull Numbers for its Sentinel-class FRCs". Seapower magazine. Washington DC. December 12, 2017. Archived from the original on December 13, 2017. Retrieved December 9, 2017. The U.S. Coast Guard has announced the names and corresponding hull numbers for its next 20 Sentinel-class Fast Response Cutters (FRCs), each vessel being named for a deceased leader, trailblazer or hero of the Coast Guard and its predecessor services of the U.S. Revenue Cutter Service, the U.S. Lifesaving Service and the U.S. Lighthouse Service, according to a Dec. 12 Coast Guard release.
  196. ^ "ALCOAST 328/19 - Oct 2019 New Fast Response Cutters Named for Coast Guard Heroes". U.S. Coast Guard. October 23, 2019. Archived from the original on October 23, 2019. Retrieved November 7, 2019. These namesakes include recipients of the Gold Lifesaving Medal, Silver Star Medal, Good Conduct Medal, and Medal of Freedom. These new cutters are scheduled for delivery starting in 2023 and will be named for the following people:
[edit]