Chestnut Hill Avenue station

Chestnut Hill Avenue
An inbound train at Chestnut Hill Avenue station in 2016
General information
LocationCommonwealth Avenue at Chestnut Hill Avenue
Brighton, Boston, Massachusetts
Coordinates42°20′17″N 71°09′11″W / 42.33817°N 71.15310°W / 42.33817; -71.15310
Platforms2 side platforms
Tracks2
ConnectionsBus transport MBTA bus: 86
Passengers
2011626 (weekday average boardings)[1]
Services
Preceding station MBTA Following station
South Street Green Line Chiswick Road
Location
Map

Chestnut Hill Avenue station is a light rail surface stop on the MBTA Green Line B branch, located in the median of Commonwealth Avenue just east of Chestnut Hill Avenue in the Brighton neighborhood of Boston, Massachusetts. Chestnut Hill Avenue has two low-level platforms, serving the B branch's two tracks; the stop is not accessible.

Just to the west of the station, there is a wye connecting the B branch to non-revenue tracks that run along Chestnut Hill Avenue to Reservoir Carhouse at Cleveland Circle. The tracks are used to supply the B branch with cars before rush hour, as the carhouse at Boston College has limited storage area.[1] The leg of the wye leading from the westbound B branch to the non-revenue tracks is out of service and paved over.

History

[edit]
Passengers waiting at Braemore Road in the 1910s

On May 14, 2008, an outbound train derailed at Chestnut Hill Avenue. It struck a nearby utility pole, which brought down the overhead wires, causing the light rail vehicle to catch fire. No injuries were reported, but the vehicle suffered significant damage.[2][3]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[4] Design for Chestnut Hill Avenue and four other B Branch stops was 30% complete by December 2022.[5] A design shown in March 2024 called for Chestnut Hill Avenue station and South Street station to be consolidated, with a single station located between Chestnut Hill Driveway and Chestnut Hill Avenue.[6] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including the combined Chestnut Hill Avenue/South Street station.[7] As of June 2024, construction is expected to start in fall 2025.[8]

References

[edit]
  1. ^ a b "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ^ "Green Line's B branch to remain shut at least through rush hour". Boston Globe. May 14, 2008. Archived from the original on July 26, 2008.
  3. ^ Finucane, Martin (May 15, 2008). "Trolley with 30 aboard derails, catches fire on the Green Line". Boston Globe. Retrieved August 28, 2016.
  4. ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  5. ^ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  6. ^ "Green Line B Branch Improvements and Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. March 22, 2024.
  7. ^
  8. ^ "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 4.