Noida Sector 51 metro station


Noida Sector 51
Noida Metro station
General information
LocationBlock E, Sector 51, Noida, Uttar Pradesh 201301
Coordinates28°35′09″N 77°22′31″E / 28.5857°N 77.3753°E / 28.5857; 77.3753
Owned byNoida Metro
Operated byNoida Metro Rail Corporation (NMRC)
Line(s)Aqua Line
PlatformsSide Platform
Platform-1 → Train terminates
Platform-2 → Depot
Tracks2
ConnectionsNoida Sector 52
 Blue Line (Delhi Metro) 
Construction
Structure typeElevated, Double-track
Platform levels2
AccessibleYes Disabled access
Other information
Websitehttp://nmrcnoida.com
History
Opened25 January 2019; 5 years ago (2019-01-25)
Electrified25 kV 50 Hz AC through overhead catenary
Services
Preceding station Logo of the Noida Metro Noida Metro Following station
Terminus Aqua Line Rainbow
towards Depot
Out-of-system interchange
Preceding station Logo of the Delhi Metro Delhi Metro Following station
Noida Sector 61 Blue Line
transfer at Noida Sector 52
Noida Sector 34
Location
Noida Sector 51 is located in Delhi
Noida Sector 51
Noida Sector 51
Location in Delhi
Noida Sector 51 is located in Uttar Pradesh
Noida Sector 51
Noida Sector 51
Location in Uttar Pradesh

The Noida Sector 51 is the elevated northern terminal metro station on the North-South corridor of the Aqua Line of Noida Metro in the city of Noida, Uttar Pradesh.[1][2] It was opened to the public on 25 January 2019.[3]

The station is connected to the Noida Sector 52 metro station on the Delhi Metro's Blue Line by a 300-metre-long pedestrian walkway.[4] An overhead walkway connecting the two stations will be built by IKEA as part of an agreement signed between the company and the Noida Authority in February 2021.[5] However, IKEA later stated that it would require at least 6 years to open its new showroom in Noida and the adjoining skywalk.[6] In March 2022, the Noida Authority stated that it had floated tenders to construct a 420 metre long and five metre wide, L-shaped, foot overbridge connecting the two stations.[7][8]

Station layout

[edit]
Noida Sector 51 track layout
to Train Terminates Here
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Depot
Next Station: Rainbow
Platform 1
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

References

[edit]
  1. ^ "Noida Metro Project". Noida Metro. Archived from the original on 22 January 2019. Retrieved 28 January 2019.
  2. ^ "Noida Metro Rail". Greater Noida.
  3. ^ "Metro's Aqua line linking Noida and Gr Noida opens for public". The Economic Times. 25 January 2019.
  4. ^ "Switching between Noida Metro Aqua Line and Delhi Metro Blue Line gets hassle-free with dedicated pathway!". The Financial Express. 11 March 2019. Retrieved 11 March 2019.
  5. ^ Shalabh (20 February 2021). "IKEA to open its first India mall in Noida, pays Rs 850 crore for land". The Times of India. Retrieved 21 February 2021.
  6. ^ "Noida Authority to soon connect Aqua and Blue line metros with footover bridge". Zee News. 14 March 2022. Retrieved 6 April 2022.
  7. ^ "In 6 Months, Noida Plans Fob To Link Sec 51-52 Stns | Noida News - Times of India". The Times of India. TNN. 13 March 2022. Retrieved 6 April 2022.
  8. ^ "Noida: Footover bridge to connect Sector 51, 52 metro stations on Blue, Aqua lines | Details". India Today. 16 March 2022. Retrieved 6 April 2022.
[edit]