Panyu Square station
Chinese name | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 番禺广场站 | ||||||||||||||||||||
Traditional Chinese | 番禺廣場站 | ||||||||||||||||||||
| |||||||||||||||||||||
General information | |||||||||||||||||||||
Location | Panyu District, Guangzhou, Guangdong China | ||||||||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||||||||||
Line(s) | Line 3 Line 18 Line 22 | ||||||||||||||||||||
Platforms | 6 (3 island platforms) | ||||||||||||||||||||
Tracks | 6 | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | 301 1803 2201 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 30 December 2006 28 September 2021 (Line 18) 31 March 2022 (Line 22) | (Line 3)||||||||||||||||||||
Services | |||||||||||||||||||||
|
Panyu Square station (simplified Chinese: 番禺广场站; traditional Chinese: 番禺廣場站; Cantonese Yale: Pūn'yùh Gwóngchèuhng Jaahm) is a station of Line 3, Line 18 and Line 22 of the Guangzhou Metro. Line 3 started operation on 30 December 2006, Line 18 started operation on 28 September 2021 and Line 22 started operation on 31 March 2022.
The station is located under the junction of Donghuan Road (东环路) and East Qinghe Road (清河东路) in the Shiqiao Subdistrict, in Panyu District, Guangzhou.[1] Panyu Square is a newly developed area to the south of Shiqiao, surrounded by the new Panyu District Government Building (新番禺区政府大楼), hotel and high-rise buildings.[2][3]
Between 16 April 2022 and 19 August 2022, to provide easier access for passengers going from Line 22 in the direction of Xiancun on Line 18, all Line 22 trains only used platform 5, and platform 6 has been taken out of use as a reserved platform. Passengers for Wanqingsha on Line 18 had to pass through the transfer concourse to reach platform 4. This arrangement has been cancelled since 20 August 2022.
Station layout
[edit]G | Street level | Exits C-F, G1, H |
L1 Concourse | Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Equipment Area | - | Station equipment |
L3 Platforms | Platform 1 | 3 towards Haibang (Bangjiang) |
Island platform, doors will open on the left | ||
Platform 2 | 3 towards Tianhe Coach Terminal or Airport North (Terminal 2) (Shiqiao) | |
L4 Concourse | Transfer Lobby | Transfer lobby between Lines 3 & 18 |
L5 Platforms | Platform 4 | 18 towards Wanqingsha (Hengli) |
Island platform, doors open on the left | ||
Platform 6 | 22 termination platform | |
Platform 5 | 22 towards Chentougang (Shiguanglu) | |
Island platform, doors open on the left | ||
Platform 3 | 18 towards Xiancun (Nancun Wanbo) |
Exits
[edit]Exit number | Exit location | |
---|---|---|
Exit A | (not open) | |
Exit C | Qinghe East Road | |
Exit D | Qinghe East Road | |
Exit E | Xingtai Road | |
Exit F | Guangchang East Road | |
Exit G1 | Qinghe East Road | |
Exit H | Guangchang West Road |
Gallery
[edit]- Platform 2 (Line 3 northbound platform)
- Line 3 concourse
- Lines 18 & 22 concourse (south-facing mezzanine)
- Lines 18 & 22 concourse (middle section)
- Lines 18 & 22 concourse (north-facing mezzanine)
- Transfer corridor
- Platform 6 (Line 22 termination platform)
References
[edit]- ^ Panyu Square
- ^ "Introduction of Metro Line 3". Archived from the original on 2008-10-04. Retrieved 2008-12-16.
- ^ Panyu Metro Stop