Yuancun station (Guangzhou Metro)
Yuancun 员村 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||||
Simplified Chinese | 员村站 | ||||||||||||
Traditional Chinese | 員村站 | ||||||||||||
| |||||||||||||
General information | |||||||||||||
Location | Huacheng Avenue East (花城大道东) and Yuancun 2nd Cross Road (员村二横路) Tianhe District, Guangzhou, Guangdong China | ||||||||||||
Coordinates | 23°06′57″N 113°21′49″E / 23.115768°N 113.363663°E | ||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
Line(s) | Line 5 | ||||||||||||
Platforms | 4 (2 island platforms) | ||||||||||||
Tracks | 4 | ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
Other information | |||||||||||||
Station code | 516 | ||||||||||||
History | |||||||||||||
Opened | 28 December 2009 20 December 2019 (Line 21) | (Line 5)||||||||||||
Closed | 2 October 2024 | (Line 21)||||||||||||
Services | |||||||||||||
|
Yuancun Station (simplified Chinese: 员村站; traditional Chinese: 員村站; Cantonese Yale: Yùhnchyūn Jaahm) is an interchange station between Line 5 and Line 21 of Guangzhou Metro, and also the terminus of Line 21.[1] It is located under the junction of Huacheng Avenue East (Chinese: 花城大道东) and Yuancun 2nd Cross Road (Chinese: 员村二横路) in Tianhe District. It lies to the east of Zhujiang New Town and to the north of Pazhou,[2][3][4] and was opened on 28 December 2009.[5]
Prior to the opening of Line 11, the dismantling work of the section from this station to Tianhe Park of Line 21 began October 2, 2024, and the terminus of Line 21 was adjusted north to Tianhe Park. The 6B train type's shielding doors and glass panel false walls of the outer platform will be removed, and then the appropriate shielding doors of the 8A train type will be installed. At the same time, it was necessary to dismantle the outer platform and the third track between the station and the Tianhe Park station area and replace the signal system to Line 11 standards.[6]
Station layout
[edit]G | - | Exits A-F |
L1 Concourse | Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms | Platform 2 | 5 towards Jiaokou (Tancun) |
Island platform, doors will open on the left | ||
Platform 1 | 5 towards Huangpu New Port (Keyun Lu) | |
L3 Equipment Area | - | Station equipment |
L4 Platforms | Platform | 11 U/C |
Island platform, under renovation | ||
Platform | 11 U/C |
Exits
[edit]There are 6 exits, lettered A, B, C, D, E and F. Exit A, B and E are accessible. All exits are located on Yuancun 2nd Cross Road.
Gallery
[edit]- Line 21 platform (prior to renovation)
- Line 5 Concourse
- Line 21 Upper Concourse (prior to renovation)
- Line 21 Lower Concourse (prior to renovation)
References
[edit]- ^ Metro Line 5 Opens This December
- ^ 廣州地鐵五號線投標申請人報名提交資料一覽表 (in Simplified Chinese).
- ^ 2005年度广州市地名命名更名变更 (in Simplified Chinese).
- ^ 5号线让员村和CBD更“亲密” (in Simplified Chinese).
- ^ Guangzhou Metro line Five to Open in December 2009
- ^ 李天研 (2024-09-11). "广州首条地铁环线11号线年底开通!10月2日起,21号线"天河公园-员村"段停运拆解" [Guangzhou's first subway loop line, Line 11, will open at the end of the year! Starting from October 2, the "Tianhe Park-Yuancun" section of Line 21 will be dismantled]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-09-11. Retrieved 2024-10-02.