Suburban Rail Loop
Suburban Rail Loop | |
---|---|
Overview | |
Status | Under construction (SRL East) |
Owner | VicTrack (Projected) |
Locale | Melbourne, Victoria, Australia |
Termini |
|
Stations | 6 (SRL East) 7 (SRL North) 2 (SRL Airport) TBD (SRL West) |
Website | suburbanrailloop.vic.gov.au |
Service | |
Type | Rapid transit |
Depot(s) | Heatherton Train Stabling Site |
Rolling stock | 4-car driverless trains (SRL East & SRL North) High Capacity Metro Trains (SRL Airport) |
History | |
Commenced | 2022 (SRL East, SRL Airport) |
Planned opening | 2035 (SRL East) 2043–53 (SRL North) 2033 (SRL Airport) TBD (SRL West) |
Estimated cost | $31–58 billion |
Technical | |
Line length | 15 km (9.3 mi) (SRL Airport) 26 km (16 mi) (SRL East) 34 km (21 mi) (SRL North) 90 km (56 mi) (total) |
Number of tracks | 2 |
Character | Underground (SRL East and SRL North) |
Electrification | Overhead catenary |
Operating speed | 100 km/h (62 mph) |
| ||
---|---|---|
Member of the Legislative Assembly for Mulgrave (2002–2023) Premier of Victoria
Ministries Elections Royal Commissions | ||
The Suburban Rail Loop (SRL) is an automated rapid transit system under construction in Melbourne, Victoria, Australia. The system is divided into four distinct sections. The two main sections, SRL East and SRL North, would eventually together form a single 60 km (37 mi) fully automated orbital metro line through the city's middle suburbs, with 13 stations between Cheltenham and Melbourne Airport connecting to eight existing Melbourne rail lines.[1]
The first section, SRL East, is a 26 km (16 mi) underground link from Cheltenham to Box Hill via Monash University. Construction commenced in 2022 and is expected to open in 2035.[2]
The second section, SRL North, will be a 34 km (21 mi) underground extension of SRL East from Box Hill to Melbourne Airport, via La Trobe University. Construction is not expected to commence until the 2030s, with completion by 2053. This section may be split into two projects due to its length and cost.[3]
The third section, SRL Airport, will be formed by the separate Melbourne Airport Rail project. This 15 km (9.3 mi) section will run from Melbourne Airport via Sunshine into the central business district via the Metro Tunnel. Despite significant delays, early construction commenced in 2023 and is expected to open in 2033.
The fourth and final section, SRL West, has not been defined in detail but would connect the city's outer western suburbs and may be formed by electrifying the existing Deer Park–West Werribee railway line from Sunshine and extending it to Werribee station. No timeframe for construction has been released.
Melbourne will be the second Australian city (after Sydney) to build a fully-fledged rapid transit system. Several orbital rail schemes have been proposed and some constructed throughout Melbourne's history, but the rail network has remained largely radial. The Victorian Labor state government led by then Premier Daniel Andrews announced the SRL as policy in the lead up to the 2018 state election. Initial planning for the SRL was carried out in secret prior to its announcement, and, when the plans were released, it received significant attention. The SRL plan has been praised for its long-term vision and ambition, as well as being an innovative solution to the difficulties faced by Melbourne's transport network,[4] but is criticised for its political motives, transparency of business case,[5] prioritisation ahead of other transport projects,[6] and large cost.[7][8]
Although the Victorian government signed the first $3.6 billion contract with the Suburban Connect consortium in December 2023 to build the tunnels,[9] the state Liberal/National opposition remains opposed to the system. Opposition Leader John Pesutto has pledged to pause and review the SRL East project if the Coalition wins government in 2026.[10] Previously, under the leadership of Matthew Guy in 2018 and 2022, the opposition had pledged to abandon the project.[11]
Background
[edit]The Melbourne transport network was substantially developed in the late 19th century, when the newly available technology of the railway enabled population growth away from the city centre. The result was the development of a largely radial network, which, over the following century, reinforced a model of urban development focused on heavy daily commuter flows into and out of the CBD. Furthermore, a program of freeway construction in the wake of the 1969 Melbourne Transportation Plan reinforced the structure of the suburbs and introduced car dependence to new regions of development not served by the legacy rail network. As a consequence, Melbourne, unlike many cities of comparable size, did not develop any major centres of employment or dense population in its outlying regions over the course of the 20th century.[12]
A number of orbital lines were constructed at the peak of railway development, but most failed to attract the necessary traffic of passengers and goods to remain sustainable into the late 20th century. The Outer Circle, which ran from Oakleigh on the Dandenong line to Fairfield on the Hurstbridge line via the Glen Waverley and Lilydale lines, was constructed between 1888 and 1891 but closed by 1897, though it was partly reopened as the Alamein branch line.[13] The Inner Circle linking the modern-day Upfield and Mernda lines, was opened in 1888 but closed to passengers in 1941.[14] The Albion-Jacana line and Newport-Sunshine line in the city's west, though performing a similar purpose, were never intended to carry passenger traffic.
In the late 20th century, interest grew in enabling orbital journeys between Melbourne suburbs. Included in the 1969 Plan were a number of orbital freeways, some of which were constructed over the following decades. The M80 Ring Road through the outer western and northern suburbs was constructed in stages between 1989 and 1999, and, by the time of its completion, was claimed by its advocates to have been partly responsible for a massive economic boom in the western suburbs, centred on its points of intersection with existing radial routes.[15][a] EastLink, a similar orbital freeway through the eastern suburbs, opened in 2008,[17] but was less successful, failing to reduce traffic meaningfully on parallel arterials such as Springvale Road.[18] Detailed plans for the North East Link, connecting the Ring Road and EastLink to complete the orbital route, were released in 2018, with construction expected to start in 2020 for an anticipated completion date of 2027.[19]
Despite the investment in orbital road transport from 1990, little changed in the structure of the public transport network. No new suburban railway lines were built after 1930, and trams were increasingly delayed by traffic congestion on key routes.[20] From 2002, the SmartBus program introduced three orbital bus routes in an attempt to meet the city's burgeoning need for outer suburban public transport. In addition to serving new corridors previously without mass transit, the buses were operated at a relatively high frequency and along direct routes, in contrast to the existing network of infrequent and circuitous routes. As a result, the SmartBus routes became the most heavily used in Melbourne, and were widely praised as a model for recasting the future public transport network.[21]
History
[edit]Proposal
[edit]In August 2018, three months prior to the 2018 Victorian state election, then Premier Daniel Andrews promised that a re-elected Labor government would undertake "the biggest public transport building program in Australian history", in a speech to the Committee for Economic Development of Australia. The comments were interpreted as a hint that as-yet-unannounced projects would be revealed closer to the election, although Andrews provided no detail in his speech.[22]
On 27 August, Andrews revealed plans for the Suburban Rail Loop for the first time: a 90 km (56 mi) orbital line for Melbourne's rail network, connecting 11 of the city's existing rail lines and serving new regions of the middle and outer suburbs at an estimated cost of $50 billion.[23] The government committed $300 million to complete a business case and feasibility study should it be re-elected, noting that the project would take several terms of government to complete.[24]
In the days following the proposal, the government revealed that its plan had been under consideration within Development Victoria, a planning agency under the Department of Environment, Land, Water and Planning for 12 months. Controversially, neither Infrastructure Victoria nor Transport for Victoria, both established by the Andrews government, had been involved in the SRL's planning stages; furthermore, neither agency had identified the need for a similar project in their long-term plans for the transport network. Andrews defended the decision to develop the SRL independently of infrastructure authorities, arguing that while Infrastructure Victoria "have lots of good ideas, they don't have every good idea".[25]
The tender process for the Melbourne Airport rail link project was launched in mid-September, and the state government confirmed that it anticipated the airport link would form part of the SRL West, with construction beginning in 2022.[26]
In mid-October, Labor federal Leader of the Opposition Bill Shorten announced support for the SRL, including a commitment for $300 million in initial federal funding should the Labor Party be elected.[27] The state government also indicated that it would be prepared to add additional stops to the loop to those included in the original announcement, particularly in the western suburbs.[28]
Days later, a leaked document from Transport for Victoria showed that the SRL had not been included in the transport authority's long-term plan for the rail network.[29]
Planning
[edit]$300 million was allocated to planning works for the SRL in the 2019 state budget.[30] Rail Projects Victoria announced registrations of interest for potential contractors were open in June,[31] and the first geotechnical investigations began in July in Box Hill.[32]
The state government announced the formation of a Suburban Rail Loop Authority in September, at the same time as confirming station precincts for SRL East.[33] In November 2019, the government announced that the loop would be an operationally independent, standalone line using different rail technology from the existing suburban rail network.[34][35] The system would use new, smaller metro rollingstock that is four to five carriages long, allowing shorter platforms.[35][34] The Premier announced an intention to use private investment to help fund the line, but did not indicate whether the line would be driverless.[35]
In 2020, the government committed a further $2.2 billion for initial and early works on the loop, with expressions of interest opened for contractors to deliver these works.[36] Jacinta Allan, who in her role as Minister for Transport Infrastructure had overseen the SRL since its inception, was given the additional role of Minister for the Suburban Rail Loop.
Release of Business and Investment Case
[edit]The Business and Investment Case of SRL was released in August 2021, primarily focusing on SRL East and North.[37] SRL East will commence building in 2022 and is expected to finish by 2035. The rail line will be fully underground between Cheltenham and the Airport, while SRL West is subject to further investigation, planning and development.
The business case modelled two staging scenarios. The first scenario has SRL North opening in two sections, the first from Box Hill to Reservoir opening in 2043 and the second between Reservoir and the Airport opening in 2053. This scenario has estimated capital costs of $24.1 to $40.2 billion and total costs of $30.7 to $50.5 billion, with estimated benefits of $48.5 to $58.7 billion.[38] The second scenario is faster but higher cost and has the section from Box Hill to Reservoir opening by 2038 and the full SRL North corridor from Box Hill to the Airport opening by 2043. This scenario had capital costs of $27.1 to $45.1 billion, total costs of $35.1 to $57.6 billion and benefits of $54.7 to $65.8 billion.[38] The timing and cost would be further refined through the tender and planning process. This gave the project a cost-benefit ratio range between 1.0 and 1.7.
The government stated that it expected $30 to $34.5 billion would be spent on the project over the 14 years to the opening of the first stage in 2035, with significant works on SRL North taking place as part of that expenditure.[39]
An Environmental Effects Statement (EES) process for SRL East was initiated in late 2021 that provided more detail on the station locations, the precinct designs, the local effects of the project and the design of the train system.[40] Community and stakeholder consultation was launched as part of this process.
In October 2021, the Minister for Transport Infrastructure Jacinta Allan introduced legislation to the Victorian Parliament to establish the Suburban Rail Loop Authority as a statutory government body and grant it a number of transport and planning powers.[41]
SRL East and North will take more than 25 years to construct and together are estimated by the project's business case to cost between $30.7 and $57.6 billion depending on project staging, of which capital costs would be between $24.1 and $45.1 billion.[42] SRL East and North will be built entirely underground along new rail alignments, while SRL Airport will be formed by the at-grade and elevated Melbourne Airport rail link and funded separately.
Under construction
[edit]SRL East
[edit]The first stage will connect Melbourne's eastern and south-eastern suburbs, including twin 26 km (16 mi) underground tunnels from Cheltenham to Box Hill via Monash University. Construction commenced in 2022 and is expected to open in 2035.[43] Passengers will be able to interchange with the existing metropolitan rail network at Cheltenham, Clayton, Glen Waverley and Box Hill. Construction on SRL East began in mid 2022 and the first services are scheduled to start in 2035.
In August 2023, a preferred bidder was announced for the first package of 16 km (9.9 mi) of SRL East tunnels between Cheltenham and Glen Waverley.[44][45] The Suburban Connect consortium consisted of the Australian construction firm CPB Contractors, Italian civil engineering company Ghella and the Spanish construction company Acciona.[45]
Proposed extensions
[edit]The SRL will ultimately consist of four sections. SRL East and SRL North will form one continuous metro line stretching 60 km (37 mi) from Cheltenham to Melbourne Airport. The two western sections, SRL Airport and SRL West, are separate lines formed by distinct projects that would require an interchange to access.
The SRL Strategic Assessment produced by Development Victoria in 2018 identified four distinct sections of the route, some of which are formed by other projects or existing rail corridors. The overall corridor selected was originally identified as a "middle" corridor, and was assessed against other routes closer to and further from the CBD before being prioritised for further investigation.[46]
SRL North
[edit]SRL North between Box Hill station and Melbourne Airport would be constructed after SRL East, and include stops at Doncaster, a middle suburb long proposed for the terminus of a new rail line; Heidelberg station on the Hurstbridge line; Reservoir station on the Mernda line; Bundoora, home to the main campus of La Trobe University; Broadmeadows station on the Craigieburn line; and the airport itself. This section of the SRL would also be constructed entirely underground, and Broadmeadows would function as a "super-hub" for the Seymour and North East regional lines.[47]
The 2021 SRL business case proposed opening SRL North in two stages, the first running from Box Hill to Reservoir and the second between Reservoir and Melbourne Airport.[37]
SRL Airport (Melbourne Airport Rail)
[edit]The under-construction Melbourne Airport rail link between the airport and Sunshine station will form the SRL Airport section of the loop, with one intermediate station at Keilor East. Trains will not continue onto Werribee, however, but will run into the Melbourne CBD via the Metro Tunnel.[48] Interchange would be required at Melbourne Airport station and Sunshine station to connect with other sections of the SRL.
This section would be mostly constructed along the existing railway corridor at surface level, commencing construction at the same time as the SRL East section in 2022.[49] It was originally planned to open in 2029-2030, however, that date was pushed back to 2033 following a dispute over whether to construct the airport station above ground or underground.[48][50]
SRL West
[edit]Apart from the termini at Sunshine and Werribee, the Strategic Assessment did not identify specific routes, intermediate stations or connections to other lines for SRL West, and suggested it would be the final section constructed.[51] The Western Rail Plan published by Transport for Victoria in October 2018 suggested that the role of SRL West could be undertaken by electrifying the Deer Park – West Werribee line to Wyndham Vale station as an extension of the radial suburban network, and extending the Werribee line to meet it at Wyndham Vale.[52] Later documents released by the government confirmed that Wyndham Vale would become an interchange station.[32] Currently, SRL West has no estimated construction and completion date, with doubts on whether it would ever be constructed as well as many of the locations in the project's possible alignment being within safe electorates for the Victorian Labor Party.
Reception
[edit]Political
[edit]Following the plan's original announcement, then federal Liberal Infrastructure Minister Alan Tudge said that the Suburban Rail Loop's "big vision is great" but said the federal government would withhold its support until further details and costings of the plan were provided.[53]
Then federal Labor leader Bill Shorten said that he "liked the principle" of the SRL, but would not immediately commit to supporting it with federal funding.[23] He announced federal Labor's official support in mid-October 2018, committing $300 million in business case funding and saying the project responded to an "old map of Melbourne... [that] simply doesn't work any more". His infrastructure spokesman, Anthony Albanese, said that "this project here in Melbourne is the most transformative project for any capital city in Australia".[27] Shorten later called the project the "Holy Grail" of public transport projects.[54]
Then opposition treasury spokesman Michael O'Brien said that the SRL was a "plan for the next election rather than a plan for the next generation", and called on the government to send its plans to Infrastructure Victoria for independent costings and analysis.[23] Despite the Coalition opposing the SRL, the plan was embraced by influential former Liberal premier Jeff Kennett, who called for bipartisan support for the project immediately after it was announced, despite expressing doubts about the accuracy of the $50 billion costing.[53]
At the 2018 state election, the traditionally Liberal-held seats of Mount Waverley, Burwood and Box Hill – all falling along the path of the SRL proposal – were claimed by the Labor Party after large swings, leading to speculation among Labor MPs and electoral commentators that the SRL announcement had contributed significantly to the government being returned with an increased majority. The phenomenon was also replicated in a number of safe Labor seats which would benefit from the line.[55][56]
In the lead-up to the 2022 state election, then Opposition Leader Matthew Guy promised to shelve the Suburban Rail Loop if the Coalition was elected, arguing that the project was a waste of money.[57][58] The SRL became a major and contentious issue during the campaign, with Guy pledging to reallocate the saved money to health infrastructure.[59] Described by some commentators as a politically risky move in Melbourne's eastern suburbs that would be connected by the line, Guy committed to honour the $2.2 billion early works contract but reappropriate the remaining $9.6 billion allocated to the SRL by the government.[60] During the campaign, there was significant debate in the media over the project's cost and value for money.[61][62] After the Labor government won a third term at the election with an increased majority, then Premier Daniel Andrews said the result was the second clear endorsement of the project by Victorian voters.[63][64]
As of 2024, the project remains opposed by the state Liberal/National opposition. Opposition Leader John Pesutto has pledged to pause and review the project if the Coalition wins government in 2026, citing concerns about large state debt, cost uncertainty, and the lack of funding available for other transport projects.[10]
Media
[edit]The Age, in its editorial the day following the announcement, wrote that "there are so many reasons to endorse this proposal that it’s easy to get carried away", but observed that "good government is ultimately about more than just vision. It’s about having the inventiveness, discipline and fiscal capacity to make that vision reality", and suggested that the true test for the SRL would be the government's ability to complete it.[65]
Herald Sun political editor Matt Johnston was less supportive of what he called a "highly political" project, arguing that the comparisons to other major global cities ignored the fact that "Australia is fairly remote, has a relatively small population and has higher labour costs". However, Johnston also noted that "the route of the suburban rail loop... would go near to, or through, Liberal-held state seats such as Mount Waverley and Burwood [and] near to, or through, federal Liberal seats such as Chisholm and Deakin".[66]
In subsequent years, The Age has called for the project to be delayed or scrapped due to increasing debt on the Victorian budget[67]
Experts and lobby groups
[edit]The SRL was warmly received by the Public Transport Users Association, with spokesman Daniel Bowen describing it as "Big City thinking" in an opinion piece.[68] Prominent public transport advocate Graham Currie also supported the plan for its potential to induce new development in the outer suburbs, although he admitted being stunned by the government's secretive planning process.[69] The Royal Automobile Club of Victoria also offered in-principle support, saying that "it makes sense for the state to protect a rail corridor through what is now 'middle Melbourne'", although it also argued that the SRL should not overshadow other improvements to the network such as Melbourne Metro 2.[70]
The SRL plan was criticised by rail lobby group the Rail Futures Institute, who argued that its benefits could be produced by a substantially cheaper network of orbital light rail routes.[71] Marion Terill of the Grattan Institute was also critical, saying that travel demand did not warrant the investment required for the SRL.[69]
Public
[edit]Media outlets reported massive levels of public support after the initial announcement of the plan.[69][72] An impromptu competition organised by The Age to redesign the Melbourne rail network map to incorporate the SRL received entries from leading cartographers and attracted thousands of public votes in the days after the announcement.[73]
Criticism
[edit]Cost
[edit]Both the plausibility and practicality of the government's initial headline $50 billion construction cost for the project were the subject of significant commentary at the time of the SRL's original announcement.
Political opponents suggested that the government had wildly understated the cost of the project, with former premier Jeff Kennett calling the figure "irresponsibly and fraudulently inaccurate",[53] state opposition spokesmen suggesting the cost could be between $50 and $100 billion,[74] and federal infrastructure minister Alan Tudge later saying he believed $100–150 billion was a more likely range.[75] Independent experts agreed that the project was likely to ultimately cost more than the government's claim.[69] Prominent transport commentator Daniel Bowen, in a "back of the envelope" analysis, concluded that the government was "close to the mark" but expressed reservations about the accuracy of his estimate.[76]
Separately, transport planners criticised the promises made by state and federal Labor for a total of $600 million in planning funding. The Age published comments from an engineer arguing that a "competent" business case could be completed for only $5 million.[77] Some commentary also questioned the capacity of the state to fund the project without severe impacts on its fiscal policy, irrespective of its actual cost.[77]
In 2022, Victoria's Parliamentary Budget Office (PBO) released analysis finding that the total construction and operating costs of SRL East and North together between 2022 and 2085 in 2022 dollars would be $29.214 billion, significantly less than other public estimates.[78] In nominal terms, not adjusted for yearly inflation, the PBO estimated that SRL East would cost $36.5 billion by 2035, but that SRL East and North would together cost $81.7 billion to build when the final section opens in 2053, and $125 billion when including 30 years of asset expenditure after opening to 2085.[79][80] The PBO analysis was requested by the State Opposition, and the large headline figure prompted calls in the media for the project to be shelved.[81] Minister Jacinta Allan dismissed the report, saying the Opposition framed the PBO request in order to obtain a large number, including unadjusted asset renewal expenses over fifty years.[82] The PBO found that while the SRL would cost $29.214 billion in 2022 dollars, its benefits would be only between $17.757 billion and $21.133 billion, meaning a cost-benefit ratio of between 0.6 and 0.7 using a 7% discount rate.[78]
Patronage
[edit]The Strategic Analysis released by the government in 2018 projects total daily trips on the SRL of 400,000 by 2051, making the line the busiest in Melbourne. It suggests that morning peak would have a 60:40 ratio of clockwise to anticlockwise travel, with the balance reversed in the afternoon peak; by comparison, Melbourne's radial lines operate at a 90:10 ratio.[83]
Independent analysis of the plan by SGS Economics in the weeks following its release broadly supported the Strategic Assessment, noting that if the SRL had been in operation in 2018, a 2 km (1.2 mi) catchment around each station would have captured "roughly: 270,600 jobs, 416,100 residents, 212,300 workers, and 112,600 higher education students". It argued that SRL East, consequently, would have served 30,000–50,000 daily trips if in operation in 2018, with the qualification that the level of service provided would need to make travel time competitive with car journeys. However, it concluded that the benefits and potential patronage of the North-East and two western sections were more nebulous, as their impact would depend on the efficiency with which the project was leveraged to create new development.[84]
Transparency
[edit]The initiation of the project's eastern alignment has faced allegations of being a form of pork barrel politics, as it strategically aligns with marginal electorates in the Victorian Legislative Assembly. Notably, stations along the Suburban Rail Loop (SRL) East, such as Burwood and Box Hill, are situated within electorates that the Victorian Labor Party secured in the 2018 Victorian state election.[85] Furthermore, reviews conducted by the Victorian Ombudsman and the Victorian Auditor-General's office in 2023 and 2022, respectively, revealed shortcomings in the project's scrutiny and economic justification. Concerns were raised about the lack of transparency in the project's development and the appointment of ministerial staffers within the Victoria State Government.[86][87]
See also
[edit]Grand Paris Express - similar project in Île-de-France region of France
Notes
[edit]References
[edit]- ^ Build, Victoria’s Big (26 October 2021). "Business and Investment Case". Victoria’s Big Build. Retrieved 24 October 2024.
- ^ Build, Victoria’s Big (26 October 2021). "Business and Investment Case". Victoria’s Big Build. Retrieved 24 October 2024.
- ^ Build, Victoria’s Big (4 August 2023). "SRL North". Victoria’s Big Build. Retrieved 24 October 2024.
- ^ Stanley, Janet; Stanley, John (18 January 2023). "Melbourne's Suburban Rail Loop: A Big Build or a big bet?". ArchitectureAU. Retrieved 7 June 2024.
- ^ Whitson, Rhiana; Kent, Lucy (4 December 2023). "Calls to halt Suburban Rail Loop project ahead of multi-billion-dollar contract signing". ABC News Australia. Retrieved 7 June 2024.
- ^ Huitson, Joseph (6 July 2023). "'The time is now': Victorian Opposition calling for Melbourne Airport Rail to be prioritised over Suburban Rail Loop". Sky News Australia. Retrieved 7 June 2024.
- ^ Kolovos, Benita (13 March 2024). "Labor won't outline cost of Melbourne's Suburban Rail Loop as opposition cites independent estimates". The Guardian. Retrieved 7 June 2024.
- ^ McCubbing, Gus (13 March 2024). "Suburban Rail Loop to cost another $16b, Victorian budget office finds". Australian Financial Review. Retrieved 7 June 2024.
- ^ "Full Steam Ahead For SRL With Major Contract Awarded | Premier of Victoria". www.premier.vic.gov.au. 12 December 2023.
- ^ a b Rooney, Kieran (28 January 2024). "Pesutto vows to pause and review Suburban Rail Loop". The Age. Retrieved 7 June 2024.
- ^ Sakkal, Paul (17 August 2022). "Matthew Guy says Coalition will shelve 'dreamt up' Suburban Rail Loop". The Age. Retrieved 8 June 2024.
- ^ Burke, Matthew (1 March 2016). "Problems and Prospects for Public Transport Planning in Australian Cities". Built Environment. 42 (1): 37–54. doi:10.2148/benv.42.1.37.
- ^ Brown, Simon Leo (15 December 2014). "Outer Circle Line film tells of railway 'debacle'". ABC News. Archived from the original on 26 August 2018. Retrieved 2 October 2018.
- ^ Webb, Carolyn (30 August 2018). "Heed the ghosts of Melbourne's railway lines past, says historian". The Age. Archived from the original on 6 September 2018. Retrieved 2 October 2018.
- ^ Hopkins, Phillip (11 October 1999). "A ring road runs through it". The Age. p. 4.
- ^ Mees, Paul (2001). The short term effects of Melbourne's Western Ring Road (PDF). Australasian Transport Research Forum. Hobart. Archived (PDF) from the original on 25 March 2016. Retrieved 25 October 2018.
- ^ Sexton, Reid (29 June 2008). "Relief as drivers get early start on road of success". The Age. p. 4.
- ^ Gardiner, Ashley (19 August 2010). "So you hoped Eastlink would make life easier, well think again Springvale Rd traffic jams as bad as ever". Herald Sun. p. 10.
- ^ Towell, Noel (9 September 2018). "North-East Link: Superhighway through Melbourne's east". The Age. Archived from the original on 26 October 2018. Retrieved 25 October 2018.
- ^ Mees, Paul; Groenhart, Lucy (December 2012). Transport Policy at the Crossroads: Travel to work in Australian capital cities 1976–2011 (PDF) (Report). RMIT University. p. 21.
- ^ Carey, Adam (27 October 2013). "The odyssey". The Sunday Age. Archived from the original on 5 November 2018. Retrieved 25 October 2018.
- ^ Preiss, Benjamin (14 August 2018). "Victorian Labor promises biggest transport building program in Australia". The Age. Archived from the original on 21 October 2018. Retrieved 25 October 2018.
- ^ a b c Jacks, Timna; Preiss, Benjamin (27 August 2018). "State government announces massive suburban rail loop for Melbourne". The Age. Archived from the original on 5 November 2018. Retrieved 25 October 2018.
- ^ Hutchinson, Samantha; Varga, Remy (28 August 2018). "Victoria's Labor government announces $50bn mega rail". The Australian. Retrieved 25 October 2018.
- ^ Carey, Adam (29 August 2018). "Rail pledge makes claim to take politics out of planning sound hollow". The Age. Archived from the original on 20 September 2018. Retrieved 25 October 2018.
- ^ "Melbourne Airport Rail Link market engagement begins". Railway Gazette. 13 September 2018. Archived from the original on 13 September 2018. Retrieved 3 November 2018.
- ^ a b Durkin, Patrick (14 October 2018). "Shorten, Andrews on unity ticket for $50b rail loop". Australian Financial Review. Archived from the original on 14 October 2018. Retrieved 3 November 2018.
- ^ Lund, Andrew (14 October 2018). "Victorian premier mulls more stations on Suburban Rail Loop". 9 News. Archived from the original on 14 October 2018. Retrieved 3 November 2018.
- ^ Carey, Adam (16 October 2018). "Leaked rail plan shows few extra services for regional commuters". The Age. Archived from the original on 24 January 2019. Retrieved 3 November 2018.
- ^ Jacks, Timna; Lucas, Clay (27 May 2019). "Victoria to write its own ticket for ambitious transport agenda". The Age. Archived from the original on 8 August 2019. Retrieved 8 August 2019.
- ^ "Victoria opens ROI process for Suburban Rail Loop". Railway Technology. 16 June 2019. Archived from the original on 8 August 2019. Retrieved 8 August 2019.
- ^ a b Jacks, Timna (23 July 2019). "Suburban Rail Loop work begins as geologists drill deep for $50b line". The Age. Archived from the original on 8 August 2019. Retrieved 8 August 2019.
- ^ Preiss, Benjamin (3 September 2019). "Suburban rail line loops in three big interchanges as route firms up". The Age. Archived from the original on 3 September 2019. Retrieved 3 September 2019.
- ^ a b "New Dedicated Trains For Standalone Suburban Rail Loop". Premier of Victoria. 24 November 2019. Archived from the original on 15 November 2022. Retrieved 28 November 2019.
- ^ a b c Precel, Nicole (24 November 2019). "Daniel Andrews eyes private investors to fund Suburban Rail Link". The Age. Archived from the original on 28 November 2019. Retrieved 28 November 2019.
- ^ Premier of Victoria (16 November 2020). "Works To Kick Off On The Suburban Rail Loop". Archived from the original on 14 November 2022. Retrieved 13 May 2022.
- ^ a b "Business and Investment Case". Suburban Rail Loop. Victorian Government. Archived from the original on 6 September 2021. Retrieved 6 September 2021.
- ^ a b Suburban Rail Loop Authority (August 2021). "SRL Business and Investment Case" (PDF). p. 308. Archived (PDF) from the original on 12 March 2022. Retrieved 13 May 2022.
- ^ Premier of Victoria (19 August 2021). "Next Steps For Suburban Rail Loop". Archived from the original on 22 January 2022. Retrieved 13 May 2022.
- ^ Suburban Rail Loop Authority (November 2021). "Suburban Rail Loop Environmental Effects Statement". srleastees.vic.gov.au. Archived from the original on 18 May 2022. Retrieved 13 May 2022.
- ^ "Suburban Rail Loop Bill 2021". www.legislation.vic.gov.au. Archived from the original on 15 December 2022. Retrieved 13 May 2022.
- ^ Build, Victoria’s Big (26 October 2021). "Business and Investment Case". Victoria’s Big Build. Archived from the original on 22 June 2022. Retrieved 13 May 2022.
- ^ Build, Victoria’s Big (26 October 2021). "Business and Investment Case". Victoria’s Big Build. Retrieved 24 October 2024.
- ^ Build, Victoria’s Big (29 August 2023). "Preferred bidder announced for SRL East tunnelling contract". Victoria’s Big Build. Retrieved 31 August 2023.
- ^ a b Duboudin, Tony (30 August 2023). "Preferred bidder named for Melbourne Suburban Rail Loop tunnelling". International Railway Journal. Retrieved 31 August 2023.
- ^ Suburban Rail Loop: Strategic Assessment (PDF). Development Victoria. 2018. p. 22. Archived (PDF) from the original on 19 September 2018. Retrieved 3 November 2018.
- ^ "Rail Loop Set To Connect North-East Victoria". Premier of Victoria. 28 August 2018. Retrieved 3 November 2018.
- ^ a b Build, Victoria’s Big (30 October 2022). "Melbourne Airport Rail overview". Victoria’s Big Build. Archived from the original on 5 January 2023. Retrieved 31 October 2022.
- ^ "SRL Airport Takes Flight As Works Begin | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 31 October 2022. Retrieved 30 October 2022.
- ^ Carmody, Broede; Rooney, Kieran (8 July 2024). "Airport rail now hinges on who pays the extra $3 billion to build it". The Age. Retrieved 10 July 2024.
- ^ Development Victoria 2018, p. 26.
- ^ Western Rail Plan (PDF). Transport for Victoria. 2018. p. 9. Archived (PDF) from the original on 7 March 2019. Retrieved 3 November 2018.
- ^ a b c Jacks, Timna; Preiss, Benjamin (28 August 2018). "Crucial questions remain over cost of Melbourne's suburban rail loop". The Age. Archived from the original on 5 November 2018. Retrieved 5 November 2018.
- ^ Eddie, Rachel (28 October 2018). "Victoria election: Daniel Andrews, Matthew Guy launch campaigns". The New Daily. Archived from the original on 7 November 2018. Retrieved 3 November 2018.
- ^ Taylor, Alistair (25 November 2018). "Did the Suburban Rail Loop win the Victorian election for Labor?". Urban. Archived from the original on 2 December 2018. Retrieved 2 December 2018.
- ^ Johnston, Matt; Dowling, James (26 November 2018). "How ALP rolled the rest". Herald Sun. p. 4.
- ^ Sakkal, Paul (17 August 2022). "Matthew Guy says Coalition will shelve 'dreamt up' Suburban Rail Loop". The Age. Archived from the original on 17 August 2022. Retrieved 17 August 2022.
- ^ Staszewska, Ewa (17 August 2022). "'Our state is sick': Guy's promise to fix Victoria's health system". skynews. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "The Suburban Rail Loop: Will it be built and do Victorians want it to be?". www.9news.com.au. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Digging in: Matthew Guy's gamble on scrapping Victoria's suburban rail loop". The Guardian. 17 August 2022. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ McMillan, Clay; Lucas, Ashleigh (28 August 2022). "Andrews questions inflated costs in Suburban Rail Loop analysis". The Age. Archived from the original on 11 January 2023. Retrieved 11 January 2023.
- ^ "Victoria's auditor general pokes holes in Suburban Rail Loop business case". The Guardian. 21 September 2022. Archived from the original on 11 January 2023. Retrieved 11 January 2023.
- ^ "Daniel Andrews says Labor victory confirms Victoria is nation's 'most progressive' state". ABC News. 26 November 2022. Archived from the original on 28 November 2022. Retrieved 29 November 2022.
- ^ "Delivering For All Victorians With The Suburban Rail Loop | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Suburban rail loop plan has lots of merit, but let's see the detail". The Age. 28 August 2018. Archived from the original on 13 September 2018. Retrieved 3 November 2018.
- ^ Johnston, Matt (31 August 2018). "Dan's tunnel is likely to have plenty of twists". Herald Sun. p. 55.
- ^ View, The Age's (7 May 2024). "Victoria is driving towards a debt cliff. Here's one way to hit the brakes". The Age. Retrieved 8 May 2024.
- ^ Bowen, Daniel (28 August 2018). "This is Big City thinking, and should be applauded". The Age. Archived from the original on 5 November 2018. Retrieved 3 November 2018.
- ^ a b c d "'A generation's worth of spending': Is the $50-billion rail loop a waste of money?". ABC News. 22 October 2018. Archived from the original on 3 November 2018. Retrieved 3 November 2018.
- ^ Jones, Dave (September 2018). "Melbourne suburban rail loop analysis". RoyalAuto. Royal Automobile Club of Victoria. Archived from the original on 5 November 2018. Retrieved 5 November 2018.
- ^ Jacks, Timna (6 September 2018). "What Melbourne's public transport could look like by 2050, according to the experts". The Age. Archived from the original on 7 September 2018. Retrieved 3 November 2018.
- ^ Koob, Simone Fox (28 August 2018). "Melbourne suburban rail loop: What readers think". The Age. Archived from the original on 6 September 2018. Retrieved 3 November 2018.
- ^ Booker, Chloe (5 September 2018). "Putting the rail loop on the map: Results in on your favourite design". The Age. Archived from the original on 13 September 2018. Retrieved 3 November 2018.
- ^ Potter, Ben (28 August 2018). "Victorian state election: Daniel Andrews floats plan for $50b suburban rail loop". Australian Financial Review. Archived from the original on 27 March 2019. Retrieved 31 December 2018.
- ^ Koziol, Michael (1 September 2018). "Alan Tudge backs 'a bigger Australia' as he eyes the demon of population policy". The Age. Archived from the original on 31 December 2018. Retrieved 31 December 2018.
- ^ Bowen, Daniel (7 September 2018). "More thoughts on the suburban rail loop (Metro 3?) – Daniel Bowen dot com". danielbowen.com. Archived from the original on 31 December 2018. Retrieved 31 December 2018.
- ^ a b Lucas, Clay; Jacks, Timna (14 October 2018). "Hundreds of millions more to plan rail loop, but not all on board". The Age. Archived from the original on 12 January 2019. Retrieved 13 January 2019.
- ^ a b Parliamentary Budget Office, Victoria (27 August 2022). "Suburban Rail Loop East and North – Value of continued investment". pbo.vic.gov.au. Archived from the original on 25 February 2023. Retrieved 24 February 2023.
- ^ "Daniel Andrews defends Suburban Rail Loop amid claims it could cost more than double the original estimate". ABC News. 17 August 2022. Archived from the original on 18 August 2022. Retrieved 18 August 2022.
- ^ Victorian Parliamentary Budget Office (18 August 2022). "Advice: Suburban Rail Loop East and North – Building and operating costs". pbo.vic.gov.au. Archived from the original on 17 August 2022. Retrieved 18 August 2022.
- ^ Ilanbey, Sumeyya (18 August 2022). "'Where is the value for money?': Experts back call to shelve $125b rail loop". WAtoday. Archived from the original on 18 August 2022. Retrieved 18 August 2022.
- ^ Clure, Elias (8 September 2022), Fears that Victoria's suburban rail loop project will have a massive cost blowout, 730: ABC News, archived from the original on 25 February 2023, retrieved 24 February 2023
- ^ Development Victoria 2018, p. 13.
- ^ Rawsley, Terry (2018). Will the $50b Suburban Rail Loop shape the Melbourne we want? (PDF). SGS Economics and Planning. pp. 9–10. Archived (PDF) from the original on 27 February 2020. Retrieved 13 January 2019.
- ^ "Daniel Andrews' $50bn rail loop through marginal seats". The Australian. 29 August 2018.
- ^ Ore, Adeshola (21 September 2022). "Victoria's auditor general pokes holes in Suburban Rail Loop business case". The Guardian. ISSN 0261-3077. Retrieved 14 December 2023.
- ^ Kolovos, Benita; correspondent, Benita Kolovos Victoria state (6 December 2023). "'Creeping politicisation' in Victoria's public service needs 'urgent attention', ombudsman warns". The Guardian. ISSN 0261-3077. Retrieved 14 December 2023.
{{cite news}}
:|last2=
has generic name (help)