M7 (Istanbul Metro)

From Wikipedia the free encyclopedia

M7 Yıldız–Mahmutbey
Kağıthane Station
Overview
StatusIn Operation
Mecidiyeköy - Mahmutbey
Mecidiyeköy - Yıldız (As Shuttle)

Under Construction
Kabataş - Yıldız
Mahmutbey - Esenyurt Meydan

In Project Phase
Esenyurt Meydan - Saadetdere
OwnerIstanbul Metropolitan Municipality
Line numberM7
LocaleIstanbul, Turkey
Termini
  • Yıldız
  • Mahmutbey
Stations17
Service
TypeRapid transit
SystemIstanbul Metro
Services1
Operator(s)Metro Istanbul A.Ş.
Depot(s)Tekstilkent
Rolling stock80 Hyundai Rotem[1]
4 carriages per trainset
History
OpenedOctober 28, 2020 (Mecidiyeköy - Mahmutbey section)
January 2, 2023 (Mecidiyeköy - Yıldız section)
Technical
Line length20[2] km (12 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC Overhead line
Operating speed80 km/h (50 mph)
SignallingCityFlo650, Bombardier Transportation
Route map

Kabataş
Line T1 Line F1 Ferries in Istanbul
Beşiktaş
Ferries in Istanbul
Yıldız
Fulya
Şişli—Mecidiyeköy
Line M2 Metrobus (Istanbul)
Çağlayan
Metrobus (Istanbul)
Kağıthane
M11 (Istanbul Metro)
Nurtepe
Alibeyköy
Line T5
Çırçır
Veysel Karani - Akşemsettin
Yeşilpınar
Kâzım Karabekir
Yenimahalle
Karadeniz Mahallesi
Line T4
Giyimkent–Tekstilkent
Tekstilkent Depot
Oruç Reis
Göztepe
Mahmutbey
Line M3
M7 train at Kağıthane

The M7, officially referred to as the M7 Yıldız–Mahmutbey metro line (Turkish: M7 Yıldız–Mahmutbey metro hattı) is a rapid transit line of the Istanbul Metro system on the European part of Istanbul, Turkey. It is colored light pink on the maps and route signs. It is the first driverless rapid transit line of the European side of Istanbul.

On 20 December 2013, the line was commissioned to Kalyon Group for construction.[3] The groundbreaking ceremony was held on 9 February 2014. The line is 20 km (12 mi) long with 17 stations.

The line is divided into three phases.[4] Currently, it is partly in service. The section between Mecidiyeköy and Mahmutbey was inaugurated on 28 October 2020.[5] The Mecidiyeköy - Kabataş[6] and Mahmutbey - Esenyurt Meydan[7] phases are still under construction, and there is also a planned extension between the stations Esenyurt Meydan - Saadetdere.

When fully completed, the M7-line will be connecting twelve districts of the Istanbul metropolitan area, namely Beyoğlu, Beşiktaş, Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler, Bağcılar, Küçükçekmece, Avcılar, Başakşehir and Esenyurt. It is projected that 300 cars of driverless metro trains will carry about one million passengers daily. The total travel time will be 31.5 minutes between the termini. The M7 line costs 3.7 billion (approx. US$1 billion).[8]

It was opened on 2 January 2023 as a shuttle between Mecidiyeköy and Yıldız. When the Kabataş stage is opened, the direct line will continue to the shuttle operation place. From Mecidiyeköy, one platform goes to Mahmutbey direction, the other platform goes to Yıldız direction.

Trains run on the Mecidiyeköy - Mahmutbey section every 6 minutes, and on the Yıldız - Mecidiyeköy section every 12 minutes.

M7 train interior
M7 Mecidiyeköy station on opening day

Stations

[edit]
No Station District Transfer Type Notes
1 Kabataş Beyoğlu Line T1Line F1 (Kabataş Transfer Center)Ferries in Istanbul (Kabataş Terminal)・Dentur Avrasya
İETT Bus: 22, 22B, 25E, 26, 26A, 26B, 27E, 27SE, 28, 28T, 29C, 29D, 30D, 41E, 43R, 58A, 58N, 58S, 58UL, 62, 63, 70KE
Underground Dolmabahçe PalaceMimar Sinan Fine Arts University・İnönü / Vodafone Park Beşiktaş Stadium
2 Beşiktaş Beşiktaş Ferries in Istanbul (Beşiktaş Terminal)(Beşiktaş and Barbaros Hayrettin Paşa Piers)TuryolDentur Avrasya
İETT Bus: 22, 22RE, 25E, 26, 26A, 26B, 27E, 27SE, 28, 28T, 29A, 29C, 29D, 29E, 30A, 30D, 30M, 36G, 36L, 40B, 40T, 41E, 42T, 43R, 50L, 55B, 55ET, 57UL, 58A, 58N, 58S, 58UL, 62, 62G, 63, 129T, 559C, DT1, DT2, U1, U2
Beşiktaş SquareGreat Beşiktaş BazaarBeşiktaş Culture CenterBahçeşehir University
↑↑ Under Construction (planned to open in June 2025) ↑↑
3 Yıldız Beşiktaş Ortaköy–Yıldız Funicular Line (Project)
İETT Bus: 27E, 27SE, 29A, 29C, 29D, 29E, 30A, 30M, 36G, 36L, 40B, 41E, 43R, 58A, 58N, 58S, 58UL, 62, 62G, 63, 129T, 559C, U1, U2
Underground Yıldız Technical University Yıldız Campus・Yıldız Mosque・Sait Çiftçi State Hospital・Barbaros Boulevard
4 Fulya İETT Bus: 26B, 43 Darphane ve Damga Matbaası Genel Müdürlüğü
↑↑ In shuttle operation (until opening of Kabataş in June 2025) ↑↑
5 Mecidiyeköy Şişli Line M2 (Şişli–Mecidiyeköy)Metrobus (Istanbul) (Mecidiyeköy)
İETT Bus: 25G, 27T, 29Ş, 30A, 30M, 32M, 33M, 33TM, 36M, 41AT, 46Ç, 46KT, 46T, 48, 48H, 48N, 48S, 49G, 49GB, 50C, 50M, 50S, 54Ç, 54E, 54HŞ, 54K, 54ÖR, 54P, 54T, 55, 59A, 59B, 59CH, 59K, 59N, 59R, 59UÇ, 62, 63, 64Ç, 65G, 66, 74, 74A, 750, 77, 77A, 79KM, 79M, 92M, 92Ş, 93M, 97M, 121A, 121B, 121BS, 122C, 122D, 122Y, 141A, 141M, 146E, 146M, 251, 252, 522, 522B, 522ST, 622, DT1, DT2, E-58, H-2, HM3, HM4
Underground Büyükdere ave・Cevahir Shopping Mall・Profilo Shopping Mall・Trump Towers・Mecidiyeköy Square
6 Çağlayan Kâğıthane İETT Bus: 46Ç, 46KT, 46T, 48, 48H, 48N, 48S, 50C, 65A, 77A, HM3 Istanbul Justice Palace・Hürriyet neighbourhood・Florence Nightingale Hospital
7 Kağıthane M11 (Istanbul Metro)HızRay
İETT Bus: 41ST, 46Ç, 46T, 48, 48H, 48N, 48T, 50D, 62, 63, 64Ç, 65A, 65G, TM3
Viaduct Kâğıthane Creek・Kağıthane Sadabad Theater・Cendere Ave
8 Nurtepe İETT Bus: 48N, 62G, 62H, TM1, TM2 Underground Güzeltepe・İSKİ・AKOM
9 Alibeyköy Eyüpsultan Line T5
İETT Bus: 48A, 49GB, 50A, 50AB, 50AC, 50AT, 50B, 50C, 50D, 50E, 50F, 50G, 50H, 50K, 50L, 50M, 50N, 50R, 50S, 50T, 50V, 50Y, 50Z, TM1, TM2, TM3, TM5, TM7, TM8, TM9, TM10, TM11, TM12, TM13, TM15, TM16, TM17, TM18, TM19
Viaduct Alibeyköy Creek
10 Çırçır İETT Bus: 37M, 37T, 37Y, 50P, TM7 Underground İBB Tevfik Aydeniz Sports Facilities
11 Veysel Karani–Akşemsettin İETT Bus: 36T, 47L, 50AT, TM7, TM8, TM19, TM10, TM11, TM12 Eyüp Park Shopping Mall・İsfanbul Theme Park
12 Yeşilpınar İETT Bus: 36T, 47L, 49Z, 50AT, TM9, TM10, TM11 İBB Erdem Beyazıt Library
13 Kâzım Karabekir Gaziosmanpaşa İETT Bus: 36L, 36T, 38B, 38Z, 49G, 50AT, 88, 88A, HT5, MK49, MK53, TM9,
14 Yenimahalle İETT Bus: 36ES, 38, 38E, 38G, HT5 Gaziosmanpaşa Training & Research Hospital
15 Karadeniz Mahallesi Line T4 (Kiptaş–Venezia station)
İETT Bus: 36A, 36CY, 36M, 36V, 336E
Venezia Mega Outlet・Metris
16 Giyimkent–Tekstilkent Esenler İETT Bus: 33, 33B, 33ES, 33M, 33TE, 33TM, 33Y, 98G, 98Y, HT11, MK53 Depot・Giyimkent・Tekstilkent
17 Oruç Reis - Yüzyıl İETT Bus: 33Y, 98Y, HT11
18 Göztepe Mahallesi Bağcılar İETT Bus: 31Y, 76A, 76O, 78, 78FB, 78H, 89C, 89T, 91E, 97GE, 97M, 141A, 141M, 146A, 146B, 146K, 146M, 146T, 303B, HT11, MK92 Medipol University Hospital
19 Mahmutbey Line M3
İETT Bus: 141K, 141M, 144M, 89C, 89T, 91E, 97E, 97GE, 97M, 98A, 98M, H-1, HT10
↓↓ Under Construction (inauguration planned in December 2026) ↓↓
20 Bölge Parkı Bağcılar Underground
21 Atatürk Mahallesi Küçükçekmece Line M9
İETT Bus: 36AY, 76O, 78ZB, 79FY, 79K, 89C, 89F, 89M, 98, 98H, 89KM, 98MB, 141K, 141M, H-3 HS1, MK19, MK3
22 Toplu Konutlar İETT Bus: 78G, 78Ş, 89, 89T, 89YB, 98AB, 98T, 141A, 141K, MR40, MR52 ArenaPark Shopping Mall
23 Tema Park M11 (Istanbul Metro) (Halkalı Stadı)
İETT Bus: 76V, 78G, 78Ş, 89A, 89K, 98S, 141M, 89YB, HT1, HT2, KÇ2, MK31, MR40, MR50, MR51
Halkalı Stadium
24 Hastane İETT Bus: 36AS, 36AY, 78G, 78Ş, 76A, 79Ş, 76V, 79Y, 89T, 89A, 89K, 89T, 98S, 141A, 141K, 141M, 142B, 142E, 142T, 144M, 146A, 146T, HT1, KÇ2, MK16, MK31, MR40, MR50, MR51 Kanuni Sultan Süleyman Training & Research Hospital
↓↓ Inauguration planned in 2028 (awaiting construction) ↓↓
25 Tahtakale Avcılar İETT Bus: 147 Underground
26 Ispartakule İETT Bus: 76A, 76T, 76V, 142B, 142E, 146A, 146F, 146T, 147, E-56, E-57, E-58, E-59, HS2, MK14, MK15, MR51
27 Bahçeşehir Başakşehir İETT Bus: 76D, 142, 142B, 144K, 146A, 146F, 146T, 147, MK15, MR51
28 Esenkent Esenyurt İETT Bus: 76D, 142, 142A, 142ES, 144A, 144K, 146A, 146F, E-57, E-58 Akbatı Mall・İstinye University Hospital
29 Ardıçlı İETT Bus: 76D, 142, 142B, 142E, 144A, 146, 147
30 Esenyurt Meydan İETT Bus: 76D, 142, 142A, 142B, 142E, 142ES, 142T, 144A, 146, 147, ES1 Esenyurt square
↓↓ Proposed (inauguration planned after 2030) ↓↓
31 Nazım Hikmet Esenyurt HızRay
İETT Bus: 142B, 145M, ES1
Underground
32 Esenyurt Belediye İETT Bus: 76D, 142, 142E, 144A, 146, 147, HS2 Esenyurt Municipality
33 Firuzköy İETT Bus: 76D, 142, 142A, 142ES, 142F, 142K, 144A, 146, 147
34 Saadetdere Avcılar M20 (Istanbul Metro)Metrobus (Istanbul)
İETT Bus: 76, 76BA, 76C, 76G, 76TM, 76Y, 145, 303A, 400A, 401, 401T, 418, 429, 429A, 448, 458, BM4, HT29, HT48
Saadetdere Metrobus Station

M7 Mecidiyeköy - Mahmutbey section

[edit]

Şişli/Mecidiyeköy - Mahmutbey section opened on 28 October 2020, the Şişli/Meciyeköy - Mahmutbey section of the M7-line serves 15 metro stations across six districts of the Istanbul City. The line is 18 km (11 mi) long. The combined length of the entire metro system in Istanbul has thus reached 172.25 km (107.03 mi). The line is the second in automatic train operation (ATO) of Istanbul after the M5 Üsküdar–Çekmeköy line, and the first ATO line on the European side of the city. All stations have platform screen doors, opening only when the train is stopped at the platform.[5]

See also

[edit]

References

[edit]
  1. ^ Istanbul metro Line M7 trains ordered. Railwaygazette.com. Retrieved on 2016-06-09.
  2. ^ "Yıldız-Mahmutbey Metro Hattı".
  3. ^ "İstanbul'a yeni metro". NTV MSNBC (in Turkish). December 20, 2013. Retrieved February 9, 2014.
  4. ^ "Istanbul Bülteni Ekim 2<<020, 16. sayfa" (PDF). Istanbul Bülteni. October 2020.
  5. ^ a b "Mecidiyeköy-Mahmutbey metrosu açıldı". Milliyet (in Turkish). October 28, 2020. Retrieved October 29, 2020.
  6. ^ "M7 Kabatas-Yıldız Metro Line". Metro Istanbul. Retrieved January 25, 2023.
  7. ^ "M7 Mahmutbey-Esenyurt Metro Line". Metro Istanbul. Retrieved January 25, 2023.
  8. ^ Çapa, Ezgi (February 9, 2017). "İstanbul için tarihi an... Bugün birleşti, bittiğinde 30 dakika sürecek". Hürriyet (in Turkish). Retrieved February 9, 2017.