Hepburn Wind Project
From Wikipedia the free encyclopedia
The Hepburn Wind Project is a wind farm built and owned by Hepburn Wind, a community co-operative, and supported by the Victorian Government.[1] The location of the project is Leonards Hill, 10 kilometres (6.2 mi) south of Daylesford, Victoria, north-west of Melbourne, Victoria. It comprises two individual 2.05 MW wind turbines supplied by REpower System AG which are projected to produce enough energy for 2,300 households when the wind is blowing,[2][3] almost as many houses are in the twin-towns of Daylesford and Hepburn Springs.[4][5]
The project is the first community-owned wind farm in Australia. The initiative emerged because the community felt that the state and federal governments were not doing enough to address climate change.[4] Hepburn Wind is the first project of the Hepburn Renewable Energy Association, now known as SHARE.
Hepburn Wind Project formally launched their share offer on 25 July 2008, and as of June 2011 over 1700 members had subscribed a total of $9.0 million. The project has secured over $13.1 million in funding with the additional funds being bank debt and Government grants.[6][7] Shares have been issued with priority to the local residents of Daylesford and Hepburn Springs.
As the project is under 30 MW, it was assessed under the local planning guidelines administered through the Hepburn Shire Council. The planning permit was issued by Hepburn Shire in February 2007.[8] The council received 325 submissions in support of the proposal and 18 objections.[9] The permit was subsequently challenged unsuccessfully at the Victorian Civil and Administrative Tribunal (VCAT) in June 2007.[10]
On 28 April 2010 the project signed a contract with REpower Systems for the turnkey construction of the wind farm. The official ground breaking ceremony was held on 8 October 2010 and was officiated by the Hon Gavin Jennings, the Victorian Minister for the Environment at the time.
Construction began in November 2010. The turbines left Germany on 5 December 2010 on the SE Panthea and arrived in Melbourne on 22 February 2011.
A community picnic day was held to view and celebrate the erection of the first turbine on Saturday, 19 April 2011.
The wind farm began generating power into the local electricity network on Wednesday, 22 June 2011.[11]
Community-owned wind farms are common in Denmark and Germany, which have high levels of wind power use.[4] Community wind projects are also emerging in Canada, the Netherlands, the United Kingdom and the United States. The director of the Hepburn Wind Project, Taryn Lane, recently was awarded "Outstanding Woman of Victoria: Trailblazer".
See also
[edit]References
[edit]- ^ "Victorian Government Backs Community Wind Farm in Hepburn" (PDF). Archived from the original (PDF) on 19 July 2008. Retrieved 12 April 2009.
- ^ Yang, Samuel (18 October 2023). "How Much Wind Do You Need for a Wind Generator to Work?". Automaxx.
{{cite web}}
: CS1 maint: url-status (link) - ^ "How Do Wind Turbines Survive Severe Storms?". Office of Energy Efficiency & Renewable Energy. 22 May 2024.
{{cite web}}
: CS1 maint: url-status (link) - ^ a b c Victorian community goes it alone on wind farm
- ^ "ATA Presentation on Community-Based Energy Initiatives" (PDF). Archived from the original (PDF) on 19 July 2008. Retrieved 8 April 2009.
- ^ "Hepburn Wind Places Order for Turbines" (PDF). Archived from the original (PDF) on 29 October 2010. Retrieved 6 February 2010.
- ^ "Green Light for Hepburn Wind" (PDF). Archived from the original (PDF) on 29 October 2010. Retrieved 13 May 2010.
- ^ "Hepburn Wind FAQs". Archived from the original on 26 May 2010. Retrieved 13 May 2010.
- ^ "Council votes yes on Leonards Hill wind farm, The Advocate, 27 Feb 2007". Archived from the original on 12 September 2010. Retrieved 13 May 2010.
- ^ Perry v Hepburn SC [2007] VCAT 1309 (27 July 2007)
- ^ Hepburn Wind generates first power into grid
External links
[edit]Media related to Hepburn Wind Project at Wikimedia Commons